BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 2, 2026 at 8:00 PM

Updated May 20, 2026

Site work and paving for a road / highway in Fifield, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The Town of Fifield is accepting bids for crack filling approximately 22 miles of roads. Sealed bids must be submitted to the Town Clerk by 5:00 p.m. on April 21. Bids may be mailed to PO Box 241, Fifield, WI 54524 or placed in the drop box at the Town Office at N13935 Ridge Ave, Fifield, WI 54524. For details, bidders are instructed to call the Road Superintendent at the provided phone number. The total length of roads to be crack filled is approximately 22 miles. Please call the Road Superintendent at 1-715-360-1864 for details. All existing cracks that have been sealed in the past and reopened should be re-sealed. New Cracks should be routed then sealed. Crack filler material to be used must meet current WisDOT standard. White Rock Rd - From State Hwy 13 to start of gravel Davis Rd - From White Rock Rd to start of gravel Berry Patch Rd - From Davis Rd to Dead End including turn around West Central Ave (Old 13 Rd) - From Balsam St north to Podvin Rd Cherry St - From West Central Ave to State Hwy 13 Ash St - From West Central Ave to State Hwy 13 Elm St - From West Central Ave to State Hwy 13 East Central Ave - From State Hwy 70 to Balsam St Willow Ave- From Balsam St to State Hwy 70 Balsam St - From Old 70 Rd (east end of bridge) to State Hwy 13 Old 70 Rd - From Old 13 Rd to State Hwy 70 past Briske Rd Krucky Rd - From Old 70 Rd to Dead End Lofdahl Rd - From Krucky Rd to Briske Rd Divine Rapids Rd - From State North side of Flambeau River Bridge to Fisher Rd Old 13 Rd - From Old 70 Rd to Peters Rd Chada Rd - From Hick's Landing Rd to Old 13 Rd Dam Rd - From Hick's Landing Rd to Dead End including turn around Shady Knoll Rd FR 144 - From State Hwy 70 To Smith Rapids Rd FR 148 Thorofare Rd - From Shady Knoll Rd to Dead End Spring Stead Rd FR 146 - From Shady Knoll Rd to Thompson Lake Rd Cy's Dr- From Springstead Rd to Dead End Fishtrap Rd - From FR 144 to Gravel Ridge Ave- From Walnut Ave to Pine St Linden Ave - From STH 13 to STH 70 Walnut St-From STH 13 to Dead End Maple St - From Linden Ave to Ridge Ave Spruce St - From STH 13 to Ridge Ave Pine St - From STH 13 to Ridge Ave Balsam St- From STH 13 to Ridge Ave

Post-Bid

Roads / Highways

$200,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 21, 2026

May 21, 2026

Project location map

Multiple Locations, Fifield, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.