Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 22, 2026 at 8:00 PM
Updated May 21, 2026
Site work for a transportation facility in Dodge Center, Minnesota. Completed plans call for site work for a transportation facility.
This project provides for the full replacement of the Medium Intensity Runway Edge Lights (MIRL) and Runway End Identifier Lights (REIL) on Runway 16-34 at the Dodg'e Center Municipal Airport. Major items of work include removal and replacement of runway edge and threshold lights, REIL's, installation of new conduit, duct bank, electrical cabling, modifications and replacement of equipment within the existing Electrical Distribution Building (EDB), and turf establishment. Approximate quantities of major items of work are as follows: Mobilization 1 Lump Sum, Traffic Provisions 1 Lump Sum, Turf Establishment 1 Lump Sum, Non-Encased Duct Bank 500 Linear Feet, Encased Duct Bank 400 Lineal Feet, 2" Conduit 13,700 Lineal Feet, Electrical Handholes 18 Each, Electrical Cabling 63,000 Lineal Feet, Trenching in Turf 23,000 Lineal Feet, Elevated Runway Edge Light 44 Each, Elevated Runway Threshold Light 16 Each, Elevated Taxiway Light 4 Each, REIL System 2 Each, EDB Modifications 1 Lump Sum, Install 4kW Regulator 1 Each.
Bid Results
Transportation Terminals
$643,702.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 21, 2026
June 5, 2026
802 Airport Dr S, Dodge Center, MN
Related To This Project
Dodge Center, MN
Bid Date: Jun 02 2026
Dodge Center, MN
Bid Date: May 19 2026
Dodge Center, MN
Bid Date: May 05 2026
Dodge Center, MN
Bid Date: Feb 10 2026
Dodge Center, MN
--
Dodge Center, MN
Bid Date: Jun 12 2025
Dodge Center, MN
Bid Date: Jul 09 2019
Dodge Center, MN
Bid Date: Apr 15 2025
Dodge Center, MN
Bid Date: Apr 15 2025
Dodge Center, MN
Bid Date: Apr 23 2025
Dodge Center, MN
Bid Date: Mar 11 2025
Dodge Center, MN
Bid Date: Mar 13 2025
Dodge Center, MN
Bid Date: Jan 28 2025
Dodge Center, MN
Bid Date: Jan 28 2025
Dodge Center, MN
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
