BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 3, 2026 at 8:00 PM

Updated April 4, 2026

Site work and paving for a road / highway in Fort Valley, Georgia. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Work includes the import, placement, and compaction of approximately 5,375 cubic yards (in place) of structural fill for the road, realigning, and paving approximately 3,380 linear feet of Sullivan Road. Work will begin at the apron from Electric Avenue and extend for about 0.39 miles north. The existing dirt road portion of Sullivan Road, south of Russell Parkway, will consist of 0.25 miles of road construction. The project also includes drainage improvements, utility relocations, erosion and sediment control, and final stabilization at each site. Attendance at the pre-bid meeting is required. All bids must be accompanied by a Bid Bond in an amount not less than five percent (5%) of the Base Bid. Performance Bond and Payment Bond, each in the amount of one hundred percent (100%) of the contract amount, will be required of the successful bidder. Bond must be written by an acceptable Surety Company licensed to do business in the State of Georgia and listed with the Department of the Treasury. See Instructions to Bidders for additional bidding requirements. Peach County reserves the right to reject all bids, to waive informalities, to re-advertise and/or to award any bid that is in the best interest of Peach County.

GC Bidding

Roads / Highways

$2,000,000.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

11

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
23
Active Projects
6
Bidding Soon
455
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 1, 2026

June 15, 2026

Project location map

To be determined, Fort Valley, GA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.