Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published July 13, 2026 at 8:00 PM
Updated July 27, 2026
Site work, paving and new construction of a mixed-use development in Indian Springs, Nevada. Working plans call for the construction of a military facility; for site work for a military facility; transportation facility; transportation facility; transportation facility; and for paving for a transportation facility.
Design and construction of a 25,300 square foot Aircraft Heavy Maintenance hangar and a 43,340 square foot Logistics Supply Warehouse, including all associated infrastructure to support Disaster Resiliency Program mission requirements. The Logistics Warehouse will be a high-bay facility featuring shipping and receiving docks, exterior roll-up metal coil doors, reinforced concrete foundation and floor slab, structural steel framing, metal panel exterior with brick veneer, and a standing seam metal roof. The maintenance hangar will include two bays with horizontal sliding pocket doors, a 15-ton bridge crane in Bay 1, anti-skid flooring, aircraft grounding points, fire suppression systems, and exhaust and ventilation systems, constructed with reinforced concrete, structural steel, metal panels, and brick veneer. Work also includes installation of security systems such as fencing, gates, intrusion detection, access control, CCTV, and cybersecurity measures. Supporting facilities encompass site preparation, stormwater management, utilities, airfield lighting, water storage, fire detection and suppression, and communications systems. All facilities will comply with DoD Unified Facilities Criteria, airfield and base design standards, and incorporate sustainable construction practices where applicable. Location: Creech Air Force Base, 3 Dreamland Drive, Indian Springs, NV 89018 Provide your feedback on BizChat Summarize key construction featuresExtract security system requirementsProvide location mailing address Drop your files here The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Final Planning
$100,000,000.00
Public - Federal
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 13, 2027
To Be Determined, Indian Springs, NV
Related To This Project
Indian Springs, NV
Bid Date: Aug 07 2026
Indian Springs, NV
Bid Date: Aug 07 2026
Indian Springs, NV
Bid Date: Jul 28 2026
Indian Springs, NV
Bid Date: Jun 15 2026
Indian Springs, NV
Bid Date: Oct 07 2025
Indian Springs, NV
--
Indian Springs, NV
Bid Date: Jul 21 2025
Indian Springs, NV
Bid Date: Aug 22 2025
Indian Springs, NV
Bid Date: Apr 30 2025
Indian Springs, NV
Bid Date: Jun 24 2025
Indian Springs, NV
Bid Date: Dec 11 2024
Indian Springs, NV
Bid Date: Aug 28 2024
Indian Springs, NV
Bid Date: Jul 10 2024
Indian Springs, NV
Bid Date: Jul 02 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
