Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 22, 2026 at 8:00 PM
Updated May 20, 2026
Site work for a water / sewer project in Joliet, Illinois. Completed plans call for site work for a water / sewer project.
This notice announces an Industry Day for the Brandon Road Interbasin Project to provide industry awareness of an upcoming construction contract and to solicit contractor feedback to improve design efficiency and cost effectiveness. The Brandon Road Interbasin Project is a critical control point intended to prevent invasive species, including invasive carp, from entering the Great Lakes. The project will construct and operate a series of deterrent measures within the lock chamber and approach channel while maintaining safe and efficient river navigation. When complete, the project will include electric, hydroacoustic, and bubble deterrent systems integrated with navigation operations. The overall project is divided into three construction increments. Increment I, the Leading Edge, includes an automated barge clearing deterrent, bubble curtain deterrent, acoustic deterrent, leading edge support facilities, an upstream boat ramp, and channel rock excavation. Increment II, which is the focus of this Industry Day, includes construction of a Flushing Lock, a Right Descending Bank wall, and associated channel rock excavation. Increment III, the Engineered Channel, includes an electric deterrent, acoustic deterrent for the engineered channel, a support facilities building, engineered channel floor and walls, and a downstream boat ramp. The Industry Day presentation will provide background on the project, construction phasing and sequencing, the current status of the Increment II design, and detailed information on the Flushing Lock and Right Descending Bank wall design. Contractors will have the opportunity to ask questions and provide input on design features to support more efficient and cost-effective construction approaches. Draft plan sets for the Flushing Lock and Right Descending Bank wall are provided for industry review to support meaningful feedback and engagement. The Method of Contractor Selection has not been determined at this Time.
Post-Bid
Water / Sewer
$25,000,000.00
Public - Federal
Site Work
Documents for this project are exclusively Plans. If Specifications become available, we will add them here.
211
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
