Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 1, 2026 at 8:00 PM
Updated May 21, 2026
Site work and renovation of a water / sewer project in Batavia, Ohio. Completed plans call for the renovation of a water / sewer project.
Work under this project is generally defined as the removal and replacement of the Clarifier #2 mechanical equipment and associated electrical and controls work at the Middle East Fork Wastewater Treatment Plant, located in the Village of Batavia. The project includes the temporary removal and reinstallation of the existing access bridge. Each bidder must submit their bid in triplicate, one original and two copies with each copy stamped "COPY." Each bidder must deposit security in the amount of 100% of the bid if in the form of a Bid Bond or at least ten percent of the bid if in the form of a certified check, cashier's check, or letter of credit, for and subject to the conditions provided in the Information for Bidders and pursuant to Ohio Revised Code Section 153.54. Attention of bidders is particularly called to the requirements as to safety regulations, conditions of employment to be observed, and minimum wage rates to be paid under the contract. All bids must comply with Clermont County General Instructions to Bidders and the requirements set forth in the Specifications Documents referenced herein to be considered. Letters of credit and bid bonds must be filed with original signatures. Facsimile and electronic copies of the letter of credit, bid bond, and Power of Attorney of the Surety will be deemed non-responsive. No bidder may withdraw a bid for a period of sixty days after the opening thereof. Contract award shall be made to the lowest and best bidder, and award may be subject to applicable funding agency approval. The Board reserves the right to reject any and all bids, to waive any informalities, and to accept any bid deemed to be in the best interest of the County and to hold such bids for sixty days before awarding a contract. Every request for such interpretation should be in writing addressed to the Clermont County Water Resources Department, Sanitary Engineering Division, 4400 Haskell Lane, Batavia, Ohio 45103, and to be given consid Question Deadline 04/20/2026 Pre-Bid Meeting 04/09/2026 at 1:00 PM
Award
Water / Sewer
$814,000.00
Public - County
Renovation, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
11
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
