BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 1, 2026 at 8:00 PM

Updated May 21, 2026

Site work and renovation of a water / sewer project in Batavia, Ohio. Completed plans call for the renovation of a water / sewer project.

Work under this project is generally defined as the removal and replacement of the Clarifier #2 mechanical equipment and associated electrical and controls work at the Middle East Fork Wastewater Treatment Plant, located in the Village of Batavia. The project includes the temporary removal and reinstallation of the existing access bridge. Each bidder must submit their bid in triplicate, one original and two copies with each copy stamped "COPY." Each bidder must deposit security in the amount of 100% of the bid if in the form of a Bid Bond or at least ten percent of the bid if in the form of a certified check, cashier's check, or letter of credit, for and subject to the conditions provided in the Information for Bidders and pursuant to Ohio Revised Code Section 153.54. Attention of bidders is particularly called to the requirements as to safety regulations, conditions of employment to be observed, and minimum wage rates to be paid under the contract. All bids must comply with Clermont County General Instructions to Bidders and the requirements set forth in the Specifications Documents referenced herein to be considered. Letters of credit and bid bonds must be filed with original signatures. Facsimile and electronic copies of the letter of credit, bid bond, and Power of Attorney of the Surety will be deemed non-responsive. No bidder may withdraw a bid for a period of sixty days after the opening thereof. Contract award shall be made to the lowest and best bidder, and award may be subject to applicable funding agency approval. The Board reserves the right to reject any and all bids, to waive any informalities, and to accept any bid deemed to be in the best interest of the County and to hold such bids for sixty days before awarding a contract. Every request for such interpretation should be in writing addressed to the Clermont County Water Resources Department, Sanitary Engineering Division, 4400 Haskell Lane, Batavia, Ohio 45103, and to be given consid Question Deadline 04/20/2026 Pre-Bid Meeting 04/09/2026 at 1:00 PM

Award

Water / Sewer

$814,000.00

Public - County

Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

11

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
341
Active Projects
202
Bidding Soon
3,127
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.