BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 10, 2026 at 8:00 PM

Updated June 10, 2026

Renovation of a theater / auditorium in Sanford, Florida. Completed plans call for the renovation of a theater / auditorium.

Reference Number 0000425808 Bid Intent Not Available The District Board of Trustees ("Board") of Seminole State College of Florida ("College") located at 100 Weldon Boulevard, Sanford, FL 32773 is accepting sealed bids from qualified, licensed, and experienced firms to perform work within a small theater space and ceramics room. The project includes installation of a lighting grid system and electrical upgrades to support ceramic kilns. Question Deadline 06/08/2026 at 12:00 PM ET Questions are submitted online Yes, Questions regarding this Invitation to Bid should be in writing to Arima Santana, Director of Purchasing through the online. The College will respond via online to all who inquire. Theater Space - Lighting Grid Installation The Contractor shall provide all labor, materials, equipment, and supervision necessary to complete the following: a. Demolition o Remove and dispose of the existing drop ceiling system, including grid, tiles, and associated components o Properly cap, protect, or relocate any existing systems encountered during demolition b. Structural / Lighting Grid InstallationFurnish and install a lighting grid system supported by steel round posts o Ensure structural stability and compliance with applicable building and safety codes o Coordinate layout and elevations with Owner prior to installation c. Ceiling Treatment o Prepare all exposed ceiling surfaces o Apply dry-fall paint to all exposed structural and ceiling components for a uniform finish d. Electrical and Lighting Adjustments o Disconnect, relocate, and reinstall existing lighting fixtures as required to integrate with the new grid system o Ensure all lighting systems are fully operational upon completion e. HVAC Coordination o Coordinate with existing HVAC systems and ductwork o Reposition diffusers, vents, or associated components as required to accommodate the new ceiling configuration o Ensure HVAC system functionality is maintained.2 Ceramics Room - Electrical Upgrades The Contractor shall provide all labor, materials, equipment, and supervision necessary to complete the following: a. Electrical Panel Installation o Furnish and install a new electrical panel sized appropriately for kiln loads o Ensure panel installation complies with all applicable electrical codes b. Kiln Power Connections o Provide and install dedicated electrical circuits and outlet(s) for ceramic kilns o Confirm voltage, amperage, and configuration requirements with Owner prior to installation o Test all connections to ensure safe and proper operation

Sub-Bidding

Theaters / Auditoriums

$95,000.00

Public - State/Provincial

Renovation

14

5

4

3

Subscribe For Documents

41 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
424
Active Projects
195
Bidding Soon
2,607
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 17, 2026

June 29, 2026

Project location map

100 Weldon Blvd, Sanford, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.