BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 8, 2026 at 8:00 PM

Updated May 15, 2026

Site work and new construction of an educational facility in Pismo Beach, California. Completed plans call for the construction of a educational facility.

All bids shall be made and presented only on the forms presented by the District. Bids shall be received in the Facilities Office at 222 Stanley Avenue, Arroyo Grande, California 93420 and shall be opened and publicly read aloud at the time and place stated. Any bids received after the specified time or any extensions due to material changes shall be returned unopened. The Project is being let in accordance with the formal bid requirements of the California Uniform Public Construction Cost Accounting Act. Contractors should consult the General Conditions, Supplementary Conditions, and General Requirements regarding milestones and liquidated damages. Pre-qualification requirements: Prequalification of bidders is mandatory for projects using funds received pursuant to the Leroy F. Greene School Facilities Act or any funds from any state bond fund that involves a projected expenditure of $1,000,000 or more. Prospective bidders are required to submit a completed set of prequalification documents on forms provided by the District. Bids will not be accepted if a contractor has not been prequalified where prequalification is required. Prequalification documents must be submitted by 2:00 p.m. on April 20, 2026, to the Facilities Office at 222 Stanley Avenue, Arroyo Grande, California 93420 Attn: Lorena Castaneda. Question Deadline 04/24/2026 Each request for clarification shall be submitted in writing, via email, to only the following persons: prebidquestions@lmusd.org Requests received less than ten (10) days before bid opening shall not be considered or responded to. The Work consists of the following: Construction of a new classroom building consisting of the following: a. (6) Classrooms b. Girls' Restroom c. Boys' Restroom d. One Single-Occupant Staff Restroom e. IT/Data Room f. PE Office. Building to be conventional wood frame construction, slab on grade, with exterior plaster cement finish, and single-ply roofing. Construction of On-Site improvements consisting of, but not limited to the following: a. General earthwork, grading and on-site utilities. b. A.C. paving and concrete drives, curbs, gutters, ramps and walks as indicated

Post-Bid

Educational

$1,000,000.00

Public - City

New Construction, Site Work

97

23

3

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
48
Active Projects
13
Bidding Soon
247
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 5, 2026

June 29, 2026

Project location map

2100 Shell Beach Rd, Pismo Beach, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.