BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 15, 2026 at 8:00 PM

Updated May 16, 2026

Site work for a development in Strasburg, Pennsylvania. Completed plans call for site work for a development.

A. The Work of the Project is defined by the Contract Documents and consists of the following The Work covered by these specifications is located along approximately 625 linear feet of Eshelman Run, a tributary to Pequea Creek. The work includes mobilization, selective site demolition, erosion and sediment controls, flow diversion, and removal of accumulated sediment to create a functional floodplain area with a baseflow channel that runs from Pleasant View Drive and ties to the upstream extents of the Phase I project on the Eshelman Property. The project area will be planted as specified in the Drawings to provide native riparian buffer habitat. Work is shown on the Drawings titled "Eshelman Run Streambank Stabilization Phase II Drawings" prepared by LandStudies, with a revision date of October 31, 2025, sheets 1 through 11, inclusive. B. The restoration work as shown in the Drawings is expected to take up to a maximum of two months. All Work for the Project, aside from the planting of the herbaceous plugs per the Landscape Planting, shall begin on the week of September 28, 2026, or after and be substantially completed by no later than November 16, 2026. This Work includes temporary and permanent seeding, and stabilization to ensure compliance with erosion and sediment control requirements as detailed on the plans. Note that the landscape planting work, including the installation of trees, shrubs, and herbaceous plugs per the Landscape Plan within the Drawings, shall be completed within the planting timeframes specified with Section 329300 - Plants. It is anticipated that the planting of herbaceous plugs per the Landscape Planting plan shall be completed within the spring planting window as specified in Section 329300. Planting of the herbaceous plugs shall be substantially completed by no later than April 16, 2027. The Work for the Project shall be completed and ready for final payment on or before May 11, 2027. Refer to Article 4 of the Agreement for details on contract time, including details on the contract time for Additive Alternate 1 Strasburg Borough invites the electronic submission of sealed bids for the Eshelman Run Streambank Stabilization via the PennBid Program. The full Advertisement for Bids, bidding instructions, and Project bid documents are available at no cost via PennBid and on the Strasburg Borough website. The right is reserved to waive informalities or defects in a bid to the extent permitted under Pennsylvania Law and to reject any or all bids or parts thereof. Question Deadline 05/21/2026 at 5:00 PM ET Questions Due Date Online Portal All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all parties recorded as having received the Bidding Documents. Questions received less than seven days prior to the date for opening of Bids may not be answered.

GC Bidding

Conservation and Development

$350,000.00

Public - City

Site Work

13

47

15

7

Subscribe For Documents

40 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
738
Active Projects
331
Bidding Soon
3,394
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 28, 2026

September 28, 2026

Project location map

29 Clover Avenue, Strasburg, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.