Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 15, 2026 at 8:00 PM
Updated May 16, 2026
Site work for a development in Strasburg, Pennsylvania. Completed plans call for site work for a development.
A. The Work of the Project is defined by the Contract Documents and consists of the following The Work covered by these specifications is located along approximately 625 linear feet of Eshelman Run, a tributary to Pequea Creek. The work includes mobilization, selective site demolition, erosion and sediment controls, flow diversion, and removal of accumulated sediment to create a functional floodplain area with a baseflow channel that runs from Pleasant View Drive and ties to the upstream extents of the Phase I project on the Eshelman Property. The project area will be planted as specified in the Drawings to provide native riparian buffer habitat. Work is shown on the Drawings titled "Eshelman Run Streambank Stabilization Phase II Drawings" prepared by LandStudies, with a revision date of October 31, 2025, sheets 1 through 11, inclusive. B. The restoration work as shown in the Drawings is expected to take up to a maximum of two months. All Work for the Project, aside from the planting of the herbaceous plugs per the Landscape Planting, shall begin on the week of September 28, 2026, or after and be substantially completed by no later than November 16, 2026. This Work includes temporary and permanent seeding, and stabilization to ensure compliance with erosion and sediment control requirements as detailed on the plans. Note that the landscape planting work, including the installation of trees, shrubs, and herbaceous plugs per the Landscape Plan within the Drawings, shall be completed within the planting timeframes specified with Section 329300 - Plants. It is anticipated that the planting of herbaceous plugs per the Landscape Planting plan shall be completed within the spring planting window as specified in Section 329300. Planting of the herbaceous plugs shall be substantially completed by no later than April 16, 2027. The Work for the Project shall be completed and ready for final payment on or before May 11, 2027. Refer to Article 4 of the Agreement for details on contract time, including details on the contract time for Additive Alternate 1 Strasburg Borough invites the electronic submission of sealed bids for the Eshelman Run Streambank Stabilization via the PennBid Program. The full Advertisement for Bids, bidding instructions, and Project bid documents are available at no cost via PennBid and on the Strasburg Borough website. The right is reserved to waive informalities or defects in a bid to the extent permitted under Pennsylvania Law and to reject any or all bids or parts thereof. Question Deadline 05/21/2026 at 5:00 PM ET Questions Due Date Online Portal All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all parties recorded as having received the Bidding Documents. Questions received less than seven days prior to the date for opening of Bids may not be answered.
GC Bidding
Conservation and Development
$350,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 28, 2026
September 28, 2026
29 Clover Avenue, Strasburg, PA
Related To This Project
Strasburg, PA
--
Strasburg, PA
--
Strasburg, PA
--
Strasburg, PA
Bid Date: Feb 13 2026
Strasburg, PA
--
Strasburg, PA
--
Strasburg, PA
Bid Date: Oct 14 2025
Strasburg, PA
Bid Date: Apr 08 2024
Strasburg, PA
--
Strasburg, PA
--
Strasburg, PA
Bid Date: Jun 23 2023
Strasburg, PA
Bid Date: Aug 03 2022
Strasburg, PA
Bid Date: Aug 05 2022
Strasburg, PA
Bid Date: May 23 2022
Strasburg, PA
Bid Date: Feb 02 2023
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
