Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 30, 2026 at 8:00 PM
Updated April 1, 2026
Site work for a water / sewer project in Mill Creek, Washington. Conceptual plans call for site work for a water / sewer project; and water / sewer project.
The work to be performed consists of furnishing all labor, tools, materials, and equipment necessary for collecting data, completion of construction management, and related services for the successful delivery of the Sweetwater Ranch Stormwater Main Replacement Project. The selected firm will provide construction management, inspection, and materials testing for the replacement of a failed stormwater main between 144th Street SE and Holly Pond in Mill Creek, WA. Work includes, but is not limited to: demolition and removal of the existing failing stormwater main, installation of a new stormwater main, and property and wetland restoration near 144th Street SE in Mill Creek, WA. SOQ documents should include: - A description of the proposed project team members, including subconsultants, identification of the proposed project manager, the roles of other team members, and summary resumes for key team members. - An overview of the team’s recent experiences in similar municipal projects. - Identification and description, with client contact information, of a minimum of three successfully completed similar projects. For each, provide agency/owner, title, phone and email, and a brief description including design and construction costs. - A sequential description of the proposed work plan, including sequence of tasks and methodologies, key deliverables, and a project timeline demonstrating project design and construction. SOQ document submittal is the sole responsibility of the candidate firm. The City reserves the right to reject any and all submissions, and to waive irregularities and informalities in the submittal and evaluation process. The response must include all requested information; indicating that information will be provided only if selected is not acceptable and may disqualify the proposal. The Service Provider awarded a contract shall comply with all relevant federal, state, and local laws, including those related to safety, environmental protection, waste reduction and recycling, and required permits and fees.
Conceptual
Water / Sewer
$1,000,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 9, 2026
May 24, 2026
To be determined, Mill Creek, WA
Related To This Project
Mill Creek, WA
Bid Date: Mar 30 2026
Mill Creek, WA
Bid Date: Jan 05 2026
Mill Creek, WA
Bid Date: Dec 30 2025
Mill Creek, WA
Bid Date: Dec 29 2025
Mill Creek, WA
--
Mill Creek, WA
--
Mill Creek, WA
--
Mill Creek, WA
Bid Date: May 05 2025
Mill Creek, WA
--
Mill Creek, WA
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
