BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 24, 2026 at 8:00 PM

Updated May 20, 2026

This is a service / maintenance or supply contract in Hillsboro, Oregon. Contact the soliciting agency for additional information.

Washington County seeks a contractor to provide as-needed exterior cleaning services, including power washing and graffiti removal, solar panel cleaning, and window washing for various County-owned and leased facilities. The contractor is required to supply all labor, supervision, tools, equipment, materials, cleaning products, and incidentals necessary to perform the work to specified standards. Services must be scheduled and coordinated through the Contract Administrator. Work must be conducted in a manner that does not impede County operations or endanger the public or employees. All work must comply with applicable safety regulations, and contractors must use safety barriers as needed and provide necessary PPE. For pressure washing, services include cleaning exterior flat surfaces, vertical surfaces, structures, and various site amenities. The contractor must have the ability to remove graffiti using sustainable products when possible and report areas needing repainting. The equipment must access building exteriors up to at least 100 feet tall, and water must be prevented from intruding into sensitive areas. Solar panel cleaning is provided on an as-needed basis, one to four times per year at designated locations, with all products used requiring safety data sheets and adherence to safety regulations. Window washing includes both interior and exterior windows and requires all necessary equipment, including lifts or scaffolding. Services are scheduled one to four times per year, and all windows must be left clean, free of streaks and residue, with incidental cleaning of minor surface contaminants. Limitations of scope include exclusion of prep work for painting or repairs, mechanical surface alterations, and construction activities requiring licensed contractors or triggering prevailing wage requirements. Only routine cleaning and maintenance are included. Instructions to bidders: - Bids must be submitted electronically via the County's Procurement Portal before the stated deadline. Google Docs or Google Pages are not accepted. - All bid line items must have a price or percentage; $0 will be considered as the bid for that item. - Bidders must examine all specifications, instructions, and terms thoroughly, provide required insurance and bonds, comply with all requirements, and ensure proper licensing. - All equipment replaced or removed remains County property unless otherwise specified. - The contractor is responsible for cleanup, indemnification, and passing clear title to the County. - Subcontractors meeting relevant thresholds must be disclosed within two working hours after the bid deadline. - Past experience, satisfactory performance, resources, and appropriate licensing may be required as proof of responsibility for award consideration. Question Deadline 04/21/2026 at 5:00 PM PT

Post-Bid

Municipal

$750,000.00

Public - County

Service, Maintenance and Supply

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
213
Active Projects
137
Bidding Soon
1,282
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 23, 2026

May 22, 2026

Project location map

To be determined, Hillsboro, OR

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.