Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 28, 2026 at 8:00 PM
Updated May 21, 2026
Site work for a playground / park / athletic field in College Park, Georgia. Completed plans call for site work for a playground / park / athletic field.
Reference Number 0000417575 Bid Intent Not Available The City of College Park is seeking sealed bids from qualified contractors for the resurfacing of three (3) community playgrounds utilizing tire-derived products Question Deadline 04/10/2026 at 12:00 PM ET Questions are submitted online Yes, Question, Answer, and Clarification Deadline Must submit questions via the online. The City of College Park reserves the right to reject any or all bids based on past performance and to waive technicalities and informalities and re-advertise. The City of College Park is seeking sealed bids from qualified contractors for the resurfacing of three (3) community playgrounds utilizing tire-derived products (TOP) in accordance with funding received through the Georgia Department of Natural Resources Environmental Protection Division Tire-Derived Products Grant Program. This project incorporates recycled tire materials to provide safe, durable, ADA-accessible playground surfacing while diverting scrap tires from the waste stream as described in the City's TOP grant application. LOCATION o Subrenia Miller Willis Park- 2902 Camp Creek Pkwy, College Park, GA 30337 o Barret Park- 2001 Walker Avenue, College Park, GA 30337 o Badgett Stadium Playground- 3636 College St, College Park, GA, 30337 Total Surface area: Approximately 11,325 square feet SCOPE of SERVICE The Contractor shall furnish all labor, materials, equipment, and supervision necessary to complete the fallowing: o Removal and disposal of existing wood mulch and plastic perimeter edging o Installation of recycled rubber containment curbing o Removal of existing (if applicable) and installation of nonwoven geotextile stabilization fabric o Installation of minimum four (4) inch compacted #57 aggregate base o Installation of minimum three (3) inch recycled tire crumb rubber attenuation layer o Installation of five-eighths (5/8") polyurethane-bound colored SBR granule wear surface o Final grading and surf ace finishing to provide smooth and uniform transitions o Finished surfacing shall be flush with installed rubber containment curbing. Completion schedule may be considered in bid award. SITE PREPARATION Work includes minor site preparation necessary to accommodate installation of the specified playground surfacing system and to ensure finished surface elevations are flush with newly installed rubber containment curbing. Minor site preparation may include: o Removal of existing loose-fill materials o Surface leveling and reshaping within playground limits o Adjustment of subgrade elevations as required for proper system thickness o Minor cutting or filling necessary to achieve smooth transitions at curbing and adjacent surfaces Work assumes existing site grades are generally suitable for installation of the specified surfacing system. Excavation, extensive grading, drainage modification, or removal and replacement of unsuitable
Post-Bid
Playgrounds / Parks / Athletic Fields
$100,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
6
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 27, 2026
May 27, 2026
Multiple Locations, College Park, GA
Related To This Project
College Park, GA
Bid Date: May 14 2026
College Park, GA
Bid Date: May 15 2026
College Park, GA
Bid Date: May 15 2026
College Park, GA
Bid Date: Jun 05 2026
College Park, GA
Bid Date: May 25 2026
College Park, GA
Bid Date: May 25 2026
College Park, GA
Bid Date: Jun 05 2026
College Park, GA
Bid Date: May 21 2026
College Park, GA
Bid Date: Apr 27 2026
College Park, GA
--
College Park, GA
Bid Date: Apr 06 2026
College Park, GA
Bid Date: Mar 20 2026
College Park, GA
Bid Date: Mar 13 2026
College Park, GA
Bid Date: Feb 17 2026
College Park, GA
Bid Date: Feb 17 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
