Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 13, 2026 at 8:00 PM
Updated May 15, 2026
Renovation of an office development in College Park, Georgia. Completed plans call for the renovation of a office development.
Reference Number 0000421972 Source ID PU.AG.USA.2579352.C21616351 Piggyback Contract No The City of college park is looking for qualified vendors to renovate the Engineering Department office space. Question Acceptance Deadline : 05/01/2026 03:00 PM EDT Questions are submitted online Yes General Requirements - Contractors License Required - Insurance Required SCOPE of SERVICE Demolition & Removal The contractor shall provide all labor, tools, and equipment necessary to complete the following: Remove and dispose of existing carpet throughout designated areas. Remove existing cubicle workstations Remove existing furniture Remove existing shelving; salvage and coordinate for reuse and relocation. Remove existing woodwork counters and counter supports. Remove existing wall base. Remove existing plotter; coordinate for salvage, reuse, and relocation. Protect existing door frames and hardware to remain in place. Protect existing acoustic ceiling tile and grid system to remain. Repairs & Surface Preparation Patch and repair any damaged gypsum wallboard (drywall) to a smooth, paint-ready finish. Prepare all surfaces for new finishes, including cleaning, sanding, and priming as required. Installation & Finishes Install new carpet flooring in all designated areas. Install new wall base to match existing facility standards. Paint existing door frames with new finish. Paint all existing partitions/walls with new finish. Verify protection of existing HVAC systems; adjust diffusers if required for new layout. Coordinate with IT staff for any relocation of data/telecom outlets if impacted. Ensure all electrical systems remain operational; modify outlets if needed to support new layout. Maintain compliance with all applicable codes and standards. Site Protection & Safety Protect adjacent occupied areas from dust, debris, and noise. Maintain safe access for building occupants during construction. Follow all OSHA and local government safety requirements. Provide daily cleanup and final debris removal. Compliance & Standards All work shall comply with: Local building codes and regulations ADA (accessibility) requirements Fire and life safety codes Local government facility standards Project Closeout Final walkthrough with Facility Manager. Completion of punch list items. Delivery of any warranties for materials and workmanship. Ensure all salvaged items are properly reinstalled or turned over.
GC Bidding
Office
$200,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
