BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 16, 2026 at 8:00 PM

Updated May 20, 2026

Site work and paving for a bridge / tunnel in Palm Springs, California. Conceptual plans call for site work for a bridge / tunnel; and bridge / tunnel.

The City of Palm Springs is seeking an engineering firm to provide full construction management services for the East Palm Canyon Bridge Rehabilitation Project. The project extends along East Palm Canyon Drive from about 600 feet west to 1,700 feet east of the bridge. The Consultant will oversee the project from start to finish, including contract administration, reviewing submittals and payments, keeping project records, and providing on-site inspection for all bridge, structural, electrical, roadway, and civil work. Responsibilities also include environmental compliance, materials testing, survey verification, traffic control oversight, and preparing all required reports and documentation. Coordination with utilities, regulatory agencies, Caltrans, and participation in project meetings will also be required. The firm must provide a licensed Professional Engineer with at least 10 years of bridge construction experience as Project Manager, along with full-time inspectors, materials testing staff, specialty inspectors, and administrative support. All work must follow applicable state, federal, and City of Palm Springs standards and regulations. The project will seismically retrofit, rehabilitate, and widen the East Palm Canyon Drive Bridge over Palm Canyon Wash, along with upgrading the adjacent pedestrian bridge. It also includes a new traffic signal at East Palm Canyon Drive and Southridge Drive. Improvements span from 600 feet west to 1,700 feet east of the bridge, widening the roadway to provide standard lanes, bike-lane shoulders, a center median, and a protected south-side sidewalk, with approach restriping for better alignment and safety. Construction will be staged to maintain one lane of traffic in each direction for the duration of the project, with short-term closures anticipated only during stage transitions. The bridge widening will occur on both sides of the existing structure. Type of Award Lump Sum Bid Valid 120 Days Start/Delivery Date August 2026 Question Deadline 04/15/2026 at 12:00 PM PT Online Q&A Yes The method of Contractor Selection has not been Determined at this time.

Conceptual

Bridges / Tunnels

$11,105,900.00

Public - City

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
349
Active Projects
182
Bidding Soon
2,061
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 23, 2026

April 23, 2027

Project location map

E Palm Canyon Dr, Palm Springs, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.