BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 11, 2026 at 8:00 PM

Updated May 16, 2026

Remodeling of an educational facility in San Diego, California. Completed plans call for the remodel of a educational facility.

The work consists of furnishing all labor, materials, transportation, equipment, and services to replace the baseball and softball scoreboards at Lincoln High School. Bids must be submitted electronically and comply fully with all bid package documents, including terms, conditions, plans, specifications, and drawings. Each bid must include a satisfactory bid security equaling ten percent of the bid value. Bids shall remain valid for ninety days after electronic opening. The bidder is required to meet a minimum Disabled Veteran Business participation percentage of at least three percent. Prevailing wages apply for all work performed on this project. No contractor or subcontractor may be listed on a bid or awarded a contract unless registered with the Department of Industrial Relations. Replacement of two existing scoreboards, including demolition and construction of new concrete footings. Existing electrical and data connections will be protected in place and re-used for the new scoreboards. Project Location: 4777 Imperial Ave., San Diego, CA 92113 The project estimate is between $175,000.00 and $210,000.00, inclusive of allowances. Pre-qualification requirements: All prime contractors must be prequalified through the District for projects estimated under $1 million. Acceptable licenses include California State Contractors License classification A, or other appropriate licenses subject to District approval. Bidders must also comply with Department of Industrial Relations registration requirements. Questions pertaining to this bid should be addressed to: Jess Imperial, Senior Contract Specialist, Construction San Diego Unified School District Facilities Planning and Construction 4860 Ruffner Street San Diego, CA 92111 jimperial@sandi.net Today: during the site visit, address your questions to the project manager, James Sangunitto. After site visit: address questions in writing to Jess Imperial email: jimperial@sandi.net and Della DuCharme email: aducharme@sandi.net not directly to the project manager. The last addendum will be issued seven (7) calendar days prior to the bid opening (April 16, 2026). All RFI's need to reach our office by 12:00 noon, Monday, April 13, 2026.

Bid Results

Educational

$214,020.00

Public - City

Remodeling

10

20

38

9

Subscribe For Documents

39 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
232
Active Projects
98
Bidding Soon
967
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.