Site work and new construction of a laboratory facility in Lead, South Dakota. Completed plans call for the construction of a laboratory facility; and for site work for a laboratory facility.

Question Deadline 04/28/2026 at 4:00 PM MT Questions and inquiries are to be submitted via e-mail to Bridget Fugett at bridget@fnal.gov This Subcontract is entered into under FFDG's Prime Contract No. 89243024CSC000002 with DOE for the operation and management of the Fermi National Accelerator Laboratory. The scope of this Subcontract is construction as set forth in the Subcontract, including the Statement of Work, and any incorporated documents. Subcontractor shall perform the work in a workmanlike manner, using new materials unless otherwise authorized by the specifications, in conformance with the specifications. This Request for Proposal consists of a model Subcontract in Sections A through J and a Request for Proposal in Sections K through M. The scope includes acquisition of an air handling unit constructed of shipping splits for use during installation of cryostat membrane, insulation, and detector components. The system must feed conditioned air to the cryostat and circulate air using large feedthroughs in the cryostat roof. The air handling equipment will connect to the cryostat via non-conductive duct material to custom duct adapters provided by FFDG, and must be electrically connected in conduit to a designated power panel provided by FFDG. Work encompasses providing an air handling system specifying total air flow into the cryostats, and includes ducting (flexible or fixed) from the air handling equipment to the cryostat input ports. The vendor will be responsible for procuring all materials, fabricating, assembling, testing, packaging, delivering, and installing the completed system at the Long Baseline Neutrino Facility (LBNF) Deep Underground Neutrino Experiment (DUNE), Far Detector and Cryogenics (FDC) subproject, located at the 4850 level underground at the Sanford Underground Research Facility (SURF) in Lead, SD.

Post-Bid

Laboratories

$10,000,000.00

Public - Federal

New Construction, Site Work

6

12

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 12, 2026

June 1, 2026

Project location map

Multiple Locations, Lead, SD

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.