Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 30, 2026 at 8:00 PM

Updated June 10, 2026

Site work for a power facility in Phoenix, Arizona. Completed plans call for site work for a power facility.

Amendment 0001, Quote Due Date Extension, Phoenix Data Center Re-cabling Project Phase III - Installation, Western Area Power Administration, Desert Southwest Region, Phoenix The data communication cabling/fiber and supporting infrastructure within the Phoenix Data Center (PDC) has reached the end of its service lifecycle. A holistic upgrade of cabling was done to the facility under Phase I and II to support WAPA operational requirements into the next decade and beyond. Phase III will focus on expanding network capacity with the installation of Intermediate Distribution Frames (IDFs) to expand port capacity in support of Common SCADA. Detailed requirements are specified in the remainder of this document, with high-level objective identified below. _ Installation of IDF in PDC in support of Common SCADA equipment Questions shall be submitted to: Timothy Kramer at kramer@wapa.gov by no later than Thursday, March 26, 2026.

Post-Bid

Power Plant

$100,000.00

Public - Federal

Site Work

5

6

8

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
117
Active Projects
50
Bidding Soon
1,562
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed