BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 29, 2026 at 8:00 PM

Updated May 21, 2026

Renovation of a mixed-use development in Doral, Florida. Completed plans call for the renovation of a parking garage; and municipal facility.

Updating of the electrical infrastructure in the parking garage of the Doral Government Center, installation of new lines from FPL transformer, installation of new electrical equipment to provide necessary power to five new level 2 and one level 3 electric vehicle (EV) chargers, with some EV chargers being installed on the parking garage roof level. Question Deadline Apr 13, 2026 at 5:00 PM all questions and/or comments regarding this ITB must be made in writing and be directed to Procurement at the following email at procurement@cityofdoral.com. All inquiries must reference "2026-13 Doral Government Center Electrical Update and EV Chargers' Installation" in the subject line. The City of Doral, FL is seeking qualified contractors to provide comprehensive electrical updates and the installation of Electric Vehicle (EV) chargers at the Doral Government Center. The project aims to modernize the existing electrical infrastructure to support new technologies and enhance the sustainability of the facility by incorporating EV charging stations. The selected contractor will be responsible for all aspects of the project, including design, procurement, installation, testing, and commissioning. Detailed Specifications: Electrical Updates A. Provide Engineer sealed plans for construction and building department approval. B. Supply and install new main disconnect inside electrical room. C. Supply and install new main disconnect inside generator room at garage building. D. Supply and install new wiring from Electrical Room to FPL transformer pad. E. Supply and install new wiring from Electrical room to Generator room. F. Run feeder from generator room to Electrical room on the roof level. G. Supply and install new 277/480V panel board on IT room. H. Supply and install one new 150KVA 480-120/208V step down transformer in Electrical room. I. Supply and install new 120/208 3PH electrical panel in electrical room. EV Chargers Installation A. Run feeds to 5 double EV chargers Level 2. ( 60A-208V 1PH). EV Chargers provided by the City. B. Run feeds to 1 single EV chargers level 3. (100A-480V 3PH). EV Charger provided by the City. C. Fire proofing of all penetrations. D. Install five double EV chargers Level 2. E. Install one EV charger Level 3.

Bid Results

Municipal

$166,750.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

11

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
261
Active Projects
108
Bidding Soon
2,074
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 27, 2026

May 22, 2026

Project location map

8401 NW 53rd Terrace, Doral, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.