Published May 14, 2026 at 8:00 PM
Updated May 19, 2026
Site work and renovation of a civil project in Jefferson, Georgia. Completed plans call for the renovation of a water / sewer project; and water / sewer project.
The project consists of the construction of the Doster Creek Lift Station and Force Main Improvements, which includes lift station rehabilitation and the installation of approximately 1,467 lineal feet of 12-inch C900 DR 14 force main pipe in Jackson County, Georgia. Except as designated by the Authority, the Contractor shall furnish all labor, materials, transportation apparatus, fuel, light and tools necessary for the entire completion of the project as outlined herein and shall construct in the best and most workmanlike manner the complete job and everything properly incidental thereto as shown on the plans, stated in the specifications, or reasonably implied there from, all in accordance with the Contract Documents, ready for occupancy and/or use in all respects. 1. The work consists of: a. Division I - Lift Station: Furnishing all labor, materials, tools, and equipment necessary for removing and replacing the existing pumps with 2 submersible pumps and rehabilitating the existing wetwell. Removing, upgrading, and replacing the existing emergency bypass, valve vault; yard piping; removing and disposing of the existing above ground pumps and housing; electrical and all related items including but not limited to clearing, erosion control, earthwork (including rock removal), sheeting, shoring, de-watering, site work, fencing, testing and start-up, and other incidentals as required for a complete and operational facility. b. Division II - Furnishing all labor, materials (except the pipe material being furnished by JCWSA), shortening the existing 7,831- foot length of forcemain by integrating a new 1,467-foot section of pipe resulting in a reduced total length of 4,587-feet. The pipeline modifications must occur while maintaining continuous management of incoming wastewater flows to prevent environmental hazards or service interruptions. All work will adhere to environmental regulations, including proper disposal of drained materials and temporary bypassing of flows, with a focus on safety of workers and the surrounding community. The shortening of the forcemain will significantly reduce the downstream head condition of the station such that final tie-in of the shortened route and the completion of the pump station rehab/swap will need to occur simultaneously LOCATION The project is in the westerly district of Jackson County Georgia in Jefferson Georgia within and along the temporary construction and/orsewer easements among the following parcels, 105 028, 105 008A, 105 011 7F, 105 011 6F, 105 011 5F,105 011 4F, 105 011 3F1, 105G OPEN2A, 105J 009, 105J 010, 105J 011, 094 009 2, 094 043, and 094 042. All bidders must submit a Contractor E-Verify Affidavit. Bids not accompanied by this affidavit will be considered non-responsive and immediately rejected. All bidders must purchase contract documents from the Jackson County Water and Sewerage Authority. Hard copies are available for $300 and electronic copies for $25.
Award
Water / Sewer
$1,792,551.00
Public - County
Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 30, 2026
June 29, 2026
Multiple Locations, Jefferson, GA
Related To This Project
Jefferson, GA
Bid Date: May 05 2026
Jefferson, GA
Bid Date: Apr 09 2026
Jefferson, GA
Bid Date: Mar 05 2026
Jefferson, GA
Bid Date: Feb 26 2026
Jefferson, GA
Bid Date: Apr 09 2026
Jefferson, GA
Bid Date: Dec 03 2025
Jefferson, GA
Bid Date: Dec 08 2025
Jefferson, GA
Bid Date: Dec 04 2025
Jefferson, GA
Bid Date: Oct 22 2025
Jefferson, GA
Bid Date: Sep 25 2025
Jefferson, GA
Bid Date: Sep 25 2025
Jefferson, GA
--
Jefferson, GA
Bid Date: Sep 25 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.