Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 15, 2026 at 8:00 PM
Updated May 16, 2026
Site work and paving for a civil project in Doraville, Georgia. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; and water / sewer project.
The City of Doraville (hereafter, City) has issued this Invitation to Bid (hereafter, ITB) for the purpose of obtaining services to construct the Doraville Peachtree Creek Greenway Phase 2A. The Doraville Peachtree Creek Greenway Phase 2A connects Aztec Road to Stewart Road along the north side of the tributary of Peachtree Creek. This is the model project segment outlined in the adopted 2022 Peachtree Creek Greenway Feasibility Study. This trail is being built within public right-of-way and on city easement within DeKalb County Board of Education (Sequoyah Middle School). The project is approximately 2,551 linear feet (0.5 miles) and includes a 10 to 12 wide concrete trail. 630 linear feet of the project will include sidewalk improvements with new ADA accessible ramps along existing streets. The project scope also include one bridge crossing, retaining walls, landscape, and stormwater improvements. Additional work associated with the project includes minor demolition and clearing, erosion control, grading, trail amenities, and signage. The new middle school is expected to open in Fall 2027, and the high school in Fall 2029. Contractors shall coordinate with the general contractor, site superintendent, and others as needed to ensure that construction activities shall not interfere with the school construction. Contact information will be provided by the City. Question Deadline 04/22/2026 Questions related to the ITB should be submitted via email to Austin Shelton, Director of Planning + Community Development (austin.shelton@doravillega.us) The City reserves the right to adjust this timetable as required. Selection Committee Recommendation: May 14, 2026 Doraville City Council Award: May 20, 2026 Doraville City Council Award (alt): June 10, 2026 Expected Contract Execution: June 15, 2026
Bid Results
Roads / Highways
$2,035,550.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 8, 2026
June 15, 2026
2421 Van Fleet Cir, Doraville, GA
Related To This Project
Doraville, GA
Bid Date: May 06 2026
Doraville, GA
Bid Date: Oct 29 2025
Doraville, GA
--
Doraville, GA
--
Doraville, GA
--
Doraville, GA
Bid Date: Aug 28 2025
Doraville, GA
--
Doraville, GA
Bid Date: Jun 04 2025
Doraville, GA
Bid Date: Mar 17 2025
Doraville, GA
Bid Date: Feb 27 2025
Doraville, GA
--
Doraville, GA
Bid Date: Feb 14 2025
Doraville, GA
--
Doraville, GA
Bid Date: Jan 23 2025
Doraville, GA
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
