BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 8, 2026 at 8:00 PM

Updated May 16, 2026

Site work and paving for a road / highway in Boston, Massachusetts. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. Please reach out to gigi.munden@boston.gov with any questions. Project work shall commence immediately upon the issuance of a notice to proceed (the "Notice to Proceed"). The Project shall reach substantial completion ("Substantial Completion") on or before 18 months from Notice to Proceed and Final completion ("Final Completion") on or before 24 months from Notice to Proceed. Liquidated Damages Liquidated damages in the amount of One Thousand Two Hundred Dollars ($1,200.00) per calendar day, will be applicable for each and every calendar day in completing the work after the date of Substantial Completion, in accordance with the provisions of Article 7 of the General Conditions Fid Kennedy Realignment construction project proposes realignment of the section of the Fid Kennedy Avenue between the Northeast corner of the V1 lot and the Northern Avenue Intersection. The realignment design provides significant improvements to safety and functionality of this segment by incorporation of two way unimpeded truck traffic (WB-67), pedestrian sidewalks on both sides, along with improvements to pedestrian crossings, landscaped sections, and safe parking opportunities for Raymond L. Flynn Marine Park ("RLFMP") tenant businesses and their customers. The project also considered the future possible signalization improvements to the Northern Avenue Intersection that is currently in concept design. Throughout the design process the RLFMP Tenants Association and Massport were invited to be part of the process by open houses held with the designer and structured feedback opportunities that shaped the final design in the construction documents. The project site encompasses Fid Kennedy Avenue from Northern Avenue to approximately Northeast corner of the V1 lot. The general scope of work for the IFB includes: _ Installation of new paved roadways, sidewalks, curbing and landscaping _ Relocation, removal and installation of electrical, water, and storm drain utilities _ Relocation of the RLFMP Sign from the North side of Northern Avenue Park entrance to South side of the Northern Avenue park entrance _ Relocation of the security equipment, installation of new walk up payment system and line striping for Parcel V1 _ Demolition and disposal of existing paving, curbing, sidewalk and earth materials Please submit any and all General Bidder questions by April 21, 2026 to the City of Boston Planning Department Procurement Office at planningprocurement@boston.gov and Gigi Munden / Real Estate at Gigi.Munden@boston.gov / RealEstateCC@boston.gov.

Bid Results

Roads / Highways

$3,758,680.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
744
Active Projects
424
Bidding Soon
3,244
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 7, 2026

July 6, 2026

Project location map

Fid Kennedy Ave, Boston, MA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.