BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 13, 2026 at 8:00 PM

Updated May 15, 2026

Site work for a water / sewer project in Palm Coast, Florida. Completed plans call for site work for a water / sewer project.

The Work consists of the construction of over 17,569-ft of new 12-14 sewer force main along A1A from Mala Compra Road to Marineland. Directional drill construction includes 4,253-ft (+/-) of new 14 PE force main. Open cut construction includes 13,316-ft (+/-) of new 12 PVC force main. This project includes work in areas that include coquina shell / rock: It is not a continuous shelf of coquina, but rather fragments of coquina rock which are mixed within the sand. The Contractor should be prepared to utilize specialized equipment to facilitate excavation activities if they encounter larger pieces of coquina along the alignment. 1. This project is being supported by FDEP grant agreement No. LPA0287 between FDEP and Flagler County for Septic to Sewer Conversion project on the Barrier Island. Question Deadline 05/01/2026 at 2:00 PM ET Any questions concerning the intent, meaning and interpretations of the bid documents including the draft agreement, shall be requested in writing through electronically at least seven (7) calendar days prior to the due date. Deadline to submit Questions Online Portal Total construction time to achieve Substantial Completion for the Project is three hundred sixty-five (365) calendar days consecutive calendar days from the date of the Notice to Proceed, with an additional sixty (60) consecutive calendar days to achieve Final Completion. A Bid Bond shall accompany each Bid if the Bid amount is one-hundred thousand dollars ($100,000) or greater. The Bid Bond shall be for an amount not less than five percent (5%) of the Bid price and shall be made payable to the City as a guarantee that the Bidder will not withdraw his/her Bid for a period of one hundred twenty (120) days after the Bid closing time. In the event the Contract is awarded to the Successful Bidder and will enter into a written Agreement with the City and furnish a Payment Bond and Performance Bond in an amount equal to the Contract Price. The Material and Workmanship Bond shall be in an amount equal to ten percent (10%) of the Contract Price as adjusted on the Final Application for Payment. The Bidder will forfeit their Bid Security if they fail to do so. All Bonds shall be secured from or countersigned by an agency or surety company recognized in good standing and authorized to do business in the State of Florida. The City reserves the right to reject all bids/submittals, and to solicit and readvertise for new bids, or to abandon the project in its entirety at any time during the process including, but not limited to, after the Notice of Intent to Award. Intent to Bid by May 13, 2026 2:00 PM EDT. Mandatory - Yes

GC Bidding

Water / Sewer

$6,000,000.00

Public - City

Site Work

45

17

52

6

Subscribe For Documents

70 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
225
Active Projects
84
Bidding Soon
1,249
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.