BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 22, 2026 at 8:00 PM

Updated May 20, 2026

Renovation of a playground / park / athletic field in Birmingham, Alabama. Completed plans call for the renovation of a playground / park / athletic field.

The project entails the renovation of the courtyard playgrounds at the Harris Early Learning Center in Birmingham, Alabama. The scope includes replacement of playground surfacing, repair and painting of concrete pathways, flushing of storm water drains and upgrading of drain grates, enhancements to an existing wood play structure, as well as additional general improvements to the playground areas. Pre-qualification is required for this project. All RFI's must be submitted in writing to Architect no later than Monday, 6 April 2026 at 3:00PM CST. as per Adda 1.

Bid Results

Playgrounds / Parks / Athletic Fields

$152,903.00

Public - State/Provincial

Renovation

19

11

14

5

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 9, 2026

May 11, 2026

Project location map

1413 7th Ave N, Birmingham, AL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.