Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 22, 2026 at 8:00 PM

Updated September 27, 2026

Site work and paving for a bridge / tunnel in Jamestown, Rhode Island. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Deck Rehabilitation Partial depth rehabilitation from the west approach to Pier 1E and approach spans between 22E and 34E Hydro demolition will be used as the demolition means for the limits noted. Full depth rehabilitation will be required at all joints and other areas will be determined during construction. Joint Rehabilitation Finger joints at the towers are to be replaced. Future maintenance access platforms to be constructed. Expansion joints along the approaches are to be replaced with polymer expansion joints. Deck control joints are to be replaced. Tower Painting Exterior painting of tower exterior (2 towers) Partial interior painting of tower interior (2 towers) Tower Steel Rehabilitation Compression link replacement at 7 of 8 existing compression links. This includes the construction of the access/construction platforms required to do the work. Elevator Rehabilitation The two existing service elevators within the towers are to be rehabilitated. A-2 Stair Access Tower Two access towers to provide access from deck level to top of the anchorage pier roof, one at each anchorage pier. Suspender Rope Replacement Replacement of suspender ropes along the suspended span. Main Cable Access and Platform for Investigation Provide access and platforms for twelve panels of the main cable for internal cable inspections. Traffic Control Provide traffic control throughout the duration of the construction. Provide a full bridge length temporary movable barrier. Provide a temporary movable barrier mover All questions or clarifications concerning the Contract documents shall be submitted by e-mail to procurement@ritba.org no later than 4:00 PM on September 21, 2026. A Performance Bond of one hundred (100) percent of the Contract price with a surety company that is satisfactory to the Authority will be required of the successful bidder. The Authority reserves the right to reject any or all bids or to waive any informality in bids received. The Authority will consider only those bids received from parties who have obtained Contract Documents directly from the Authority.

GC Bidding

Bridges / Tunnels

$60,000,000.00

Public - State/Provincial

Paving, Renovation, Site Work

1

2

2

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
743
Active Projects
335
Bidding Soon
4,966
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 2, 2026

December 18, 2026

Project location map

To be determined, Jamestown, RI

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed