BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 14, 2026 at 8:00 PM

Updated May 20, 2026

Site work for a civil project in Denny Island, British Columbia. Completed plans call for site work for a road / highway; and bridge / tunnel.

Doc Creek is located at 51°57'39.8"N 127°39'59.1"W The Doc Creek Major Works project, located approximately 35 km southeast of Shearwater, BC. Access to this remote location is limited to boat and aircraft, requiring barging of all equipment and supplies. Road access to the start of work is on a rough road with drive time of approximately 2 hours from camp to back. The project primarily involves the deactivation of approximately 26km of road. This includes brushing, ditching, culvert and bridge maintenance, and signage. Road maintenance, if required is limited to the extent required to facilitate road deactivation activities. The contractor is responsible for maintaining roads to facilitate safe access. The scope of work encompasses several key activities. Road deactivation includes removing culverts and bridges, constructing cross-ditches and waterbars, pulling back unstable fill slopes, and re-vegetating disturbed areas. Specific bridge maintenance requirements, including repairs, replacements, and load rating updates, are detailed for several crossings. Bridge removals require environmental monitors and adherence to specific procedures for handling debris and waste. The contractor must supply various materials, including culverts, sediment fencing, and stream protection supplies, while the Province will provide grass seed and sediment matting. The project necessitates specialized equipment, including excavators, a crane or launch beam, and rock trucks. Work must be completed according to provided prescriptions, maps, stream crossing assessments, an environmental management plan, and terrain reports. Specific deactivation specifications cover log salvage, culvert and bridge removals, cross-ditch construction, and erosion control. Environmental considerations are paramount, especially regarding work near fish streams, invasive plant management, and petroleum product storage. The contractor must also adhere to fire safety regulations and maintain appropriate firefighting, and fall arrest equipment. Documents can be obtained from www.bcbid.gov.bc.ca OTHER BIDDER: Axton Timber Ltd (Campbell River BC) $3,300,000

Award

Roads / Highways

$1,764,681.00

Public - State/Provincial

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1
Active Projects
0
Bidding Soon
5
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 28, 2026

June 1, 2026

Project location map

approximately 35 km southeast of Shearwater, Denny Island, BC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.