BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 27, 2026 at 8:00 PM

Updated May 21, 2026

Site work, paving and outdoor lighting for a mixed-use development in San Juan Bautista, California. Working plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; road / highway; road / highway; and for outdoor lighting for a road / highway.

The bids for this project were rejected. This project will rebid at a later date that is still to be determined. The project is located within the community of San Ardo and includes improvements along College Street, Center Street, Godchaux Street, and the intersection of Cattlemen Road. The general work description for the Community of San Ardo School Connections Project includes but is not limited to construction of curbs, curb ramps and sidewalks, cold planning asphalt concrete, placement of hot mix asphalt, clearing and grubbing, traffic striping, flashing beacons and lighting. Such other items or details, not mentioned above, that are required by the Construction Plans, Standard Specifications, Standard Plans, or these Special Provisions, shall be performed, placed, constructed, and/or installed. The Engineer's Estimate for the construction cost is $2,340,000. The Contractor awarded the Contract shall begin work when authorized by the County of Monterey. This work shall be diligently prosecuted to completion before the expiration of 60 WORKING DAYS beginning on the date listed on the issuance of the "Notice to Proceed". Liquidated damages are $5,200 per calendar day and accrue starting on the 1st day after the expiration of the working days and as specified in section 8-1.10. A bidder's bond, issued by an admitted corporate surety company in an amount equal to at least ten percent (10%) of the amount bid, must accompany the bid. The successful bidder shall furnish a payment bond and a performance bond each in the amount of one hundred percent (100%) of the Contract. The County reserves the right to reject any or all bids or to waive any irregularities or informalities in any bids or in the bidding.

Final Planning

Roads / Highways

$1,758,740.00

Public - County

Outdoor Lighting, Paving, Site Work

42

8

11

4

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
305
Active Projects
167
Bidding Soon
2,388
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 16, 2026

September 14, 2026

Project location map

Multiple Locations, San Juan Bautista, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.