Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 6, 2026 at 8:00 PM
Updated May 20, 2026
Renovation of a transportation facility in Winnipeg, Manitoba. Completed plans call for the renovation of a transportation facility.
The work consists of a mechanical upgrade for the Transit Maintenance and Repair Building - East High Bay. Major components include demolition of old HVAC equipment and patching roof openings, offloading pre-purchased Tempeff dual core heat recovery units (HRUs), installation of new roof-mounted HRUs connected to the natural gas system, provision of ventilation at a rate of 1.5 cfm per square foot, supply air distribution at the middle of the G Track, and exhaust air at high level along the north and at high and low levels along the south of the G Track. New CO and NOx sensors will be installed and connected to the existing monitoring system. The sprinkler system will be modified to accommodate the new equipment. Digital controls will be provided and tied into the existing JCI Metasys system according to City of Winnipeg standards. Electrical work will supply power to new mechanical loads. Structural upgrades are required to support the HRUs. Existing infrared heaters will be removed and replaced. Roof hydrants will be installed for maintenance of roof-mounted equipment. The contractor is responsible for coordinating rebate applications for HRUs and infrared heaters to Efficiency Manitoba with the equipment suppliers and crediting the rebate to the city. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.
Bid Results
Transportation Terminals
$1,182,552.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 5, 2026
May 8, 2026
485 Brandon Ave, Winnipeg, MB
Related To This Project
Winnipeg, MB
Bid Date: May 01 2026
Winnipeg, MB
Bid Date: May 08 2026
Winnipeg, MB
Bid Date: May 14 2026
Winnipeg, MB
Bid Date: May 14 2026
Winnipeg, MB
Bid Date: May 14 2026
Winnipeg, MB
Bid Date: May 14 2026
Winnipeg, MB
Bid Date: May 14 2026
Winnipeg, MB
Bid Date: May 14 2026
Winnipeg, MB
Bid Date: Apr 23 2026
Winnipeg, MB
Bid Date: Apr 23 2026
Winnipeg, MB
--
Winnipeg, MB
--
Winnipeg, MB
Bid Date: Apr 23 2026
Winnipeg, MB
Bid Date: Apr 22 2026
Winnipeg, MB
Bid Date: May 06 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
