BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 6, 2026 at 8:00 PM

Updated May 21, 2026

Site work and new construction of a power facility in Winnipeg, Manitoba. Completed plans call for the construction of a power facility.

The primary objective is to assess market capability, capacity, and interest in delivering the project. The preferred approach is an Engineering, Procurement and Construction (EPC) model; however, respondents are asked to consider a modified EPC structure that enables separate pricing of discrete work packages based on scope definition and associated risk profiles. Manitoba Hydro has identified a need for about 750 MW of new dispatchable capacity, specifically combustion turbines constructed to support system reliability during drought and stress events while operating less than 5% of the time on average. The turbines will provide operational flexibility, transmission support, and future adaptability for alternative fuels. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform. Question Deadline 04/17/2026 at 12:00 AM CT Manitoba Hydro encourages each Respondent to submit clarification requests, questions and comments to ensure that Manitoba Hydros requirements and intent set out in this RFI are correctly understood.

Post-Bid

Thermal Power Generation

$750,000,000.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 23, 2026

January 1, 2027

Project location map

360 Portage Ave, Winnipeg, MB

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.