Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 16, 2026 at 8:00 PM
Updated May 21, 2026
Renovation of a detention facility in Hilo, Hawaii. Completed plans call for the renovation of a detention facility; and detention facility.
Mechanical and Electrical Systems Repairs and Improvements Phase 4 at the Hawaii Community Correctional Center. The work and delivery are to be performed on the Island of Hawaii. Important: See the Notice to Bidders for additional requirements. The work generally consists of replacement of the existing sanitary, vent pipes and sprinkler heads & pipe inside of the chase rooms in Komohana Building. Project consists of replacement of the existing sanitary, vent pipes, fire sprinkler heads and pipes inside of the chase rooms and fire sprinkler heads in cells and corridors in Komohana Building. 1. Project Location: Hawaii Community Correctional Center (60 Punahele Street, Hilo, Hawaii). B. Perform operations and furnish equipment, fixtures, appliances, tools, materials, related items and labor necessary to execute, complete and deliver the Work as required by the Contract Documents. C. The Division and Sections into which these specifications are divided shall not be considered an accurate or complete segregation of work by trades. This also applies to work specified within each section. D. Contractor shall not alter the Drawings and Specification. If an error or discrepancy is found, notify the Contracting Officer. E. Specifying of interface and coordination in the various specification sections is provided for information and convenience only. These requirements in the various sections shall complement the requirements of this Section. F. The intent of this project is for work to be conducted in an operational correctional facility. Correctional Facility staff will be present during construction because of the constant inmate movement and the inability to segregate the work area from inmate traffic. The estimated construction cost is between $500,000 and $1 million. Question Deadline 04/30/2026 Requests transmitted or otherwise communicated directly to the Consultant *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Bid Results
Jails / Prisons
$511,700.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
