BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 8, 2026 at 8:00 PM

Updated May 20, 2026

Site work for a water / sewer project in New Lisbon, Wisconsin. Completed plans call for site work for a water / sewer project.

The work consists of the installation of approximately 500 linear feet of water main and five service reconnections. Bids must be sealed and accompanied by a 5% bid bond or certified check. Contractors must be licensed and insured to perform work in Wisconsin. The City reserves the right to reject any or all bids, waive informalities, and accept the bid deemed most advantageous to the City. Work includes, but is not limited to: o Saw-cutting of existing pavement (approximately 500 linear feet). o Excavation and trenching (approximately 10 feet wide by 500 feet long) to a depth of approximately 6.5-7 feet. o Installation of City-furnished water main pipe, valves, and hydrants. o Reconnection of five (5) existing water services to the new main. o Proper trench bedding, backfilling, and compaction to 95% Modified Proctor density. o Restoration of roadway including base course and temporary and/or permanent asphalt patching. o Coordination with City staff for water system shutdowns and reconnections. o Cleanup and restoration of disturbed areas. The City has developed preliminary budget estimates for portions of this project. These values are provided for informational purposes only and do not represent guaranteed quantities or final project costs. Current estimated material and related costs include: Pipe, Valves, and Fittings - $24,000.00 Asphalt Replacement $20,000.00 - $25,000.00 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Questions regarding this bid may be directed to: Joe Willard, Lead - Water & Sewer Department City of New Lisbon Phone: (608) 562-3794 Email: nlutil@mwt.net Construction Start - Late May/ Early June Estimated Project Completion - Mid-Late June 2026

Post-Bid

Water / Sewer

$25,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
194
Active Projects
110
Bidding Soon
1,510
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 17, 2026

June 1, 2026

Project location map

E Goodland St, New Lisbon, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.