Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published July 30, 2026 at 8:00 PM
Updated August 1, 2026
Site work and new construction of a mixed-use development in Wheat Ridge, Colorado. Conceptual plans call for the construction of a swimming pool; for site work for a playground / park / athletic field; and swimming pool.
https://ngazette.com/city-survey-goes-out-to-residents/ With a list of improvements identified by the city and council adding up to 150 million dollars over the next 10 years, we thought we would open the conversation to all readers and ask you to submit your answers, opinions, encouragements and anything else you’d like to share to WRgazette@gmail.com These 3 questions have been pulled from the multi question survey that many (but not all) residents have been receiving. 1) The City of Wheat Ridge has identified significant capital improvement needs over the next 10 years, including new police and city facilities, bike and pedestrian network improvements, proactive street maintenance, pool replacement, and other projects. This survey will first ask about capital projects generally before discussing specific projects. 2) If the City could only fund some of these projects, please choose up to two that you would like to see funded first: Replacement of the Anderson Outdoor Pool Bike and pedestrian network improvements (beyond current investments) A combined Parks and Public Works maintenance facility A new Civic Center with City Hall and Police headquarters Acquisition of parks and athletic fields at closed school sites (Kullerstrand and Wilmore-Davis) for continued community use Proactive infrastructure maintenance 3) One option for raising revenue for capital improvements is a 1% sales tax increase ($1 on a $100 purchase) that would raise approximately $11 million annually. Would you support or oppose a 1% sales tax increase for capital improvements? Another option for raising revenue for capital improvements is a 10-mill property tax increase that would generate approximately $8.4 million annually, at an estimated additional cost of approximately $375 per year for a home valued at $600,000. Some neighborhoods are flooding after heavy rains. Should they alone pay for storm drainage? Our city staff are spread across multiple owned and leased locations. Shouldn’t it befit us for them to all be under one roof? Is it time to invest in our infrastructure or is it time to safeguard our savings and as we struggle at the gas pump or produce store, maybe the city should slow down its spending? ----------------------------------------------------- The City of Wheat Ridge is seeking proposals from qualified multidisciplinary consultant teams to provide professional planning, public engagement, design, and construction documentation services for the replacement of the City’s existing outdoor community pool at Anderson Park. The new facility should offer a modern aquatic environment for residents of all ages and abilities, support recreation and aquatic programming, and reflect community priorities through a comprehensive public engagement process. All pool-specific infrastructure, including components within the existing building, is included in the scope. The City also aims to expand staff offices and storage space through this design. The adjacent building, renovated in 2018-2019, has ongoing issues with water supply, sewer lines, electrical, heating, and air conditioning; bid submissions should include alternate estimates analyzing and designing recommended improvements for these systems. The selected consultant will lead a structured planning and design process, including concept development, community engagement, schematic design, design development, cost estimating, and preparation of final construction documents suitable for bidding and construction. Consultants responding to the RFP must provide a detailed approach to the scope, a work plan, a schedule, a staffing plan, and a fee proposal for delivering the outlined services. Question Deadline 04/14/2026 at 2:00 PM MT Deadline for submitting questions regarding the RFP. The method of Contractor Selection has not been Determined at this time.
Conceptual
Swimming Pools
$8,000,000.00
Public - City
New Construction, Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 30, 2026
April 30, 2027
4355 Field St, Wheat Ridge, CO
Related To This Project
Wheat Ridge, CO
Bid Date: Jun 16 2026
Wheat Ridge, CO
Bid Date: Jun 04 2026
Wheat Ridge, CO
Bid Date: May 08 2026
Wheat Ridge, CO
Bid Date: Jul 03 2026
Wheat Ridge, CO
--
Wheat Ridge, CO
Bid Date: Jun 15 2026
Wheat Ridge, CO
--
Wheat Ridge, CO
Bid Date: May 15 2026
Wheat Ridge, CO
Bid Date: Apr 23 2026
Wheat Ridge, CO
Bid Date: Apr 09 2026
Wheat Ridge, CO
--
Wheat Ridge, CO
Bid Date: Jan 26 2026
Wheat Ridge, CO
Bid Date: Dec 12 2025
Wheat Ridge, CO
Bid Date: Jan 15 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
