BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 19, 2026 at 8:00 PM

Updated May 20, 2026

Site work for a water / sewer project in Savannah, Georgia. Working plans call for site work for a water / sewer project.

The Savannah Inner Harbor Dredging Contract provides construction services, including furnishing personnel, transportation, mobilization/demobilization, equipments/materials required in connection with maintenance dredging. This contract is traditionally performed with a hydraulic cutterhead dredge, the duration is expected to be one year from Notice to Proceed. Up to five million, six hundred thousand cubic yards of maintenance material is expected to be removed from the inner harbor. The work is located in the deep draft Savannah Harbor navigation project in Georgia in the vicinity of Chatham County, Georgia (GA) / Jasper County, South Carolina (SC). The Savannah Inner Harbor channel is 47 ft. deep MLLW / 500 ft. wide to the upper end of Kings Island Turning Basin: 36 ft. deep MLLW / 400 ft. wide to the upper end of Argyle Island Turning Basin; 30 ft. deep MLLW 200 ft. wide to the upper limit of the project. Savannah Harbors Kings Island Turning Basin (KITB) is the primary turning basin for large civilian / military ships, lying adjacent to the Georgia Ports Authority docks. KITB requires dredging twice a year to allow the loaded ships to freely turn when using the port. Up to 1.5 million cubic yards of maintenance material are removed from the KITB annually.Other contractor(s) may be working for the Savannah District on the Savannah Harbor, to include confined upland dredged material containment areas / designated staging areas. If such work occurs, the contractors shall coordinate activities under the direction of the Contracting Officer.A majority of the material dredged from the Savannah Inner Harbor must be placed in upland confined disposal areas adjacent to the Savannah River. Savannah confined upland disposal areas DMCAs 12A, 13A, 13B / Jones Oysterbed Island are owned by local sponsor Georgia Department of Transportation. Disposal areas DMCAs 14A / 14B are owned by the Joint Project Office of the Georgia / South Carolina Port Authorities. Portions of DMCAs 2A / Jones/Oysterbed are owned by the Georgia Department of Transportation / the US Fish / Wildlife Service. DMCA 1N is owned entirely by the US Fish / Wildlife Service. The Federal Government holds existing easements on all confined upland disposal areas in the Savannah Harbor except DMCA 1N which has a Memorandum of Understanding. Environmental windows limit the timing of dredging in the Savannah Inner Harbor. The environmental windows in Savannah include a Striped Bass spawning window between dates 1 April through 15 May which limits the amount / timing of dredging above station 63+360 (River Mile 12), / a dissolved oxygen window (approximately July 1 through September 30). To protect sturgeon aggregation areas in the upper river, no dredging is allowed above STA 105+500 1 May through 31 October. Certain reaches of O/M sediments may contain cadmium (Cd) in levels significant enough to harm foraging avian species in the DMCAs. Therefore, O/M sediments in those reaches will be tested by the Government prior to dredging. If Cd is found in those sediments equal to or greater than 14 mg/kg, then options will be exercised that include disposal of the sediments in specific DMCAs under special handling conditions.Obstructions are objects or materials in the required side slope cross sections or in the existing ground surface which are unknown at the time of encounter by the dredge or identified by pre / post hydrographic surveys, / monthly condition surveys. Obstructions are objects which cannot be removed by a hydraulic pipeline dredge. The Contractor may encounter obstructions during dredging operations / must remove the objects or materials to provide the required section as shown on the cross-section plates. If the Contractor is performing maintenance dredging with a pipeline dredge, the dredge must act as a probe for obstructions. The object removed will be the property of the Contractor unless it has been determined to be culturally significant. The base contract will include mobilization/demobilization, maintenance dredging, moves, dive team diving, / equipment rental for obstruction removal. Contract options include Cd dredging with placement to the backside of DMCA 14B / maintenance dredging as cap material placed on top of the Cd dredged material. The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Final Planning

Water / Sewer

$100,000,000.00

Public - Federal

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 20, 2026

Project location map

To Be Determined, Savannah, GA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.