Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 12, 2026 at 7:00 PM

Updated November 18, 2026

Site work and new construction of an educational facility in Cary, North Carolina. Working plans call for the construction of a educational facility; and for site work for a educational facility.

https://www.wral.com/news/education/wake-school-680-million-dollar-bond-election-day-november-2026/ Wake County voters approved a $680 million loan for the Wake County Public School System, largely focused on renovations and replacements, rather than new schools. With 202 of 216 precincts reporting, 314,506 voters approved the bond, compared to 181,888 who voted against it. Other WRAL Top Stories Hegseth is set for his first Pentagon news briefing since May as he faces possible impeachmentHegseth is set for his first Pentagon news briefing since May as he faces possible impeachment Watch More The bond will be funded by a dedicated property tax of $4.10 for every $100,000 of property value. The new bond is a reflection of new priorities for the state's largest school system: Fixing up existing schools that it had deprioritized in favor of new construction and employee pay raises. The bond covers the 2027-28 and 2028-29 school years. Just 17% of the funds will likely go toward building new schools, and that money will go only toward planning and initial construction for three east Wake schools that would open in 2029 or later. Wake County puts a school bond referendum before voters roughly every four years. They’re for facilities only, because bonds can’t legally fund recurring expenses, such as teachers. In between those referenda, which only cover two years at a time, the county secures loans on its own. Those loans tend to have higher interest rates than referendum-approved bonds because they aren't backed by a separate tax, but taxpayers still pay back those loans, plus interest. The county estimates having to pay $363.4 million in interest over the 20-year life of the bond, on top of the $680 million principal bond amount. The Wake school bond was one of five bonds before voters in Wake County on Tuesday. The others are smaller bonds for Wake Technical Community College, two for the City of Raleigh and one for the Town of Knightdale. The Raleigh bonds would not require a tax increase. The Wake County Democratic Party endorsed all of them, while the Wake County Republican Party opposed all of them. County Democrats said the bonds would make investments in schools and communities, while county Republicans said municipalities need to scale back. What's in the bond: HVAC, renovations, student devices and more Here's what the bond will pay for, according to the school board’s capital improvement plan: Renovations of current schools. About $329.7 million is planned for significant renovations at nine schools. That's a $201 million increase in the renovation plans for the bond years of the 2022 capital improvement plan, the 2023-24 and 2024-25 school years, combined. About 40% of that will go toward a new building for Ligon Magnet Middle School. About half of all of the funds will go toward major renovations at Cary High and East Garner Magnet Middle. The rest will go toward smaller renovations at Briarcliff, Hunter Magnet, Washington Magnet and Wendell Magnet elementary schools; and Athens Drive Magnet and East Wake Magnet high schools. Replacing HVAC and other equipment. About $98.7 million will go toward replacing infrastructure that's past its useful life, an increase from the 2022 capital improvement plan of $23.7 million during the previous bond years. Roughly half of that will go toward heating, ventilation or air conditioning equipment replacements at nearly two dozen schools, according to the district. Other lifecycle replacements include safety equipment, roofing, parking, fire alarms, elevators, intercom systems and sports facilities. The district has struggled with malfunctioning HVAC systems in schools — even newer schools with newer systems — for years. Schools, or portions of schools, have been sweltering in the heat or frigid in the cold, and dozens of schools have dismissed students early as a result. District officials acknowledge that much of that is due to aging equipment, which the bond would help replace, and inadequately maintained equipment. The district has about $800 million in deferred maintenance, but maintenance isn’t part of the bond. State law forbids bonds from covering recurring operating expenses. Teacher pay, employees and regular maintenance of facilities come from the annual operating budget, which is comprised of a combination of state, county and federal funds. Laptops and technology. About $59.2 million will go toward technological devices. That's a bit more than the $52.2 million included in the 2022 capital improvement plan for the previous bond years. Some of that will go toward replacing student devices, despite several board members and many parents urging the district to reconsider whether to issue devices to students in its lowest grade levels. The district hasn't decided how or whether to change its device strategy for the youngest grade levels but has been conducting surveys and consulting with staff. New schools. $143.2 million will go toward planning and initial construction at three different new elementary schools in eastern Wake, where enrollment growth is still expected. They include Marshburn Road Elementary in Wendell, Poole Road Elementary in east Raleigh and Little Creek Elementary in Zebulon. While the district isn’t growing much anymore, pockets of it still are and 18 schools are still closed off to new families because of how overcrowded they are. The district also has more than 900 classroom trailers at dozens of schools to handle extra students the buildings don’t have room for. Trailer classrooms. About $6.5 million will go toward trailer classrooms, including getting rid of them, renovating them or moving some from schools that no longer need them to schools that do. That compares to $5.9 million in the 2022 capital improvement plan's bond years. Last school year, the district had 943 mobile classrooms, accounting for 10% of the district's entire classroom space, according to the district. Some of those were contained within the same trailer and some trailers had only one classroom. The vast majority of the trailers will remain, even after the 2028 and 2029 projects. Other bonds before voters Voters also approved a $149.1 million bond for Wake Technical Community College. Raleigh residents approved two bonds of $101.5 million each for transportation and housing, though the city bonds wouldn't come with tax increases. The Town of Knightdale has a $55 million parks and recreation bond on the ballot, costing $35 for every $100,000 of assessed property value. The Wake Tech bond would pay for expanded academic programs in several trades, including public safety; facility renovations at Wake Tech's southern campus; and facility and equipment upgrades across campuses. It would cost a Wake taxpayer 90 cents for every $100,000 of property value annually. Raleigh says it doesn't need a tax increase for its bonds because it began saving for them last year. More than half of Raleigh's housing bond would cover affordable housing development and preservation. The rest would cover homebuyer assistance, development on city land and homelessness response. Raleigh's transportation bond would cover three road projects, expanded biking and walking networks, and traffic safety efforts on neighborhood roads. -------------------- TIMELINE: As of September 21, 2026, the project is seeking site plan approval and building permits. A construction manager has been selected, and bidding is still anticipated in October 2026. Construction is expected to begin in January of 2027.

Pre-Construction/Negotiated

Educational

$58,000,000.00

Public - County

New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
284
Active Projects
98
Bidding Soon
2,152
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed