BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 24, 2026 at 8:00 PM

Updated May 20, 2026

Site work and paving for a transportation facility in Hillsboro, Oregon. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.

Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Question Deadline 04/16/2026 at 5:00 PM PT Online Q&A Yes Scope of Services The work includes but is not limited to: 1. Reconstruction of the following areas at Hillsboro Airport: a. Approximately 550 linear feet of Runway 13R-31L. b. Intersecting portions of Taxiway B, from the runway to approximately the Runway Safety Area (RSA), including structural pavement and shoulders. c. Exit A8, from Runway 13R-31L to Taxiway A. d. Exit A9, from Runway 13R-31L, across Taxiway A, and to its tie-in with the transient parking access. e. Taxiway A, from near Taxiway M to its southern terminus. 2. The work includes removal of asphalt concrete; stripping of top soil; excavation and fill; construction of mechanical stabilization, aggregate base, and asphalt concrete pavement surface; concrete pads; pavement markings; construction of subdrainage system; relocation of utilities; grading and seeding; aggregate turf; construction of access roads; installation of runway and taxiway lighting; providing temporary runway and lighting system; and providing electrical vaults, junction boxes, transformers, conduits, and conductors. The bidder further promises that all work under this Contract shall be substantially complete on or before September 30, 2027.

Bid Results

Transportation Terminals

$7,422,920.00

Public - City

Paving, Site Work

133

26

29

4

Subscribe For Documents

41 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
213
Active Projects
137
Bidding Soon
1,282
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 23, 2026

June 23, 2026

Project location map

3355 NE Cornell Rd, Hillsboro, OR


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.