BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 14, 2026 at 8:00 PM

Updated May 14, 2026

Site work for a water / sewer project in Reno, Nevada. Completed plans call for site work for a water / sewer project.

Amendment 0002 Further questions from industry and responses. 1. How long, once we pull the equipment, do we have to put the system back online According to the fuel techs at site, they need fuel daily. 2. How long can the system be down 3. The PWS in Para 1.4 states "Replace the fuel farm Motor" and "Rebuild the Pump," but in PRS #1 it states "...replace the pump, rebuild the motor..." Which is correct 4. Since no one knows what's wrong with the meter, why not replace it Response from unit representative: "We could afford to have the fuel farm down for two or three days. If this will require longer we can definitely coordinate something on our side for a longer repair time but that would not be preferred. We would like to replace both motor and pump to reduce down time on this project. We would also like to replace the meter if possible." End of Amendment 0002 Replacement and repair services for the NVARNG fuel farm system to restore safe and reliable fuel transfer operations. The work includes replacement of the existing fuel farm motor, rebuilding of the pump, and repair of the fuel meter to ensure proper delivery of fuel from underground storage tanks into HEMTT refueler vehicles. The current system components have been damaged due to prior stress and bypassed safeguards, creating a risk of equipment failure, overheating, and potential fire hazards. The objective of this requirement is to correct existing deficiencies, prevent system failure, and ensure continued safe operation of the fuel farm. Work is anticipated to be performed during the period of June 1 through June 12, 2026, as further detailed in the solicitation and Performance Work Statement. Questions/Clarifications submisison date and time: Tuesday, April 21, 2026 11:30 PM PDT. Responses will be consolidated and posted as an amendment to this solicitation.

Award

Water / Sewer

$27,142.00

Public - Federal

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
77
Active Projects
38
Bidding Soon
337
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 5, 2026

June 1, 2026

Project location map

20000 Army Aviation Dr, Reno, NV

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.