BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 3, 2026 at 8:00 PM

Updated April 4, 2026

This is a service / maintenance or supply contract in Washington, District of Columbia. Contact the soliciting agency for additional information.

The Design/Build Contractor shall complete the under-construction rehabilitation of Parking Lot 9, including perimeter security, parking lot resurfacing, sink hole investigation and remediation, electrical work, and landscaping. The perimeter security work is part of a larger, phased security enhancement that will ultimately surround and protect the Jamie L. Whitten Building, a Level IV facility. Materials currently stored on site include shallow footed bollards with bollard covers, deep footed bollards, and granite curbs. The bollards, manufactured by Guardiar, were designed to meet an M50/P1 crash rating. The Design/Build Contractor is responsible for verifying quantities and determining the suitability of stored materials for reuse. A site visit is required prior to bid submission. Due to the Washington Metropolitan Area Transit Authority (WMATA) Orange, Blue, and Silver lines running approximately 6 feet below the parking lot, the successful contractor shall immediately coordinate with WMATA engineering staff to resolve all outstanding issues. Construction documents dated April 16, 2021 will be included with the future solicitation but are incomplete and must be updated to reflect actual site elevations, particularly along the north border, to ensure bollards extend 36 inches above grade. Construction began in 2024 but was halted after sink holes developed adjacent to the WMATA elevator. The contractor shall determine the full extent of sink holes throughout Lot 9 and develop a remediation plan approved by the Department and WMATA. Langan, geotechnical engineers, investigated the sink holes using ground penetrating radar and soundings and proposed remediation in their final report dated January 28, 2026, which will be provided with the solicitation. Section 106 Historic Preservation authorities approved the 2021 design, and major design changes requiring re-approval are not anticipated. There are no restrictions on work hours, and project completion is required within eight months of contract award. Location: Jamie L. Whitten Building, 1400 Independence Avenue SW, Washington, DC 20250 The Method of Contractor Selection has not been determined at this Time.

Conceptual

Military

Public - Federal

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
127
Active Projects
3
Bidding Soon
1,524
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.