BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 6, 2026 at 8:00 PM

Updated May 20, 2026

Site work and paving for a playground / park / athletic field in Williston, North Dakota. Completed plans call for site work for a playground / park / athletic field; and for paving for a playground / park / athletic field.

Roadway construction including excavation, aggregate base course, hot mix asphalt paving, and storm culvert installation. Each bid is to be submitted on the basis of cash payment for the work and is to be enclosed in a sealed envelope addressed to the Executive Director. Each bid shall be accompanied by a Bidder's Bond in a sum equal to 5% of the full amount of the bid, executed by the bidder as principal and by a surety company authorized to do business in this State, conditioned that if the principal's bid be accepted and the contract be awarded, the bidder will, within 10 days after Notice of Award, execute and effect a contract in accordance with the terms of the bid and provide a Performance and Payment Bond in the amount of 100% of the Contract Price with a corporate surety approved by the Owner. The Bid Bond and Contractor's License Renewal Certificate shall be submitted in a separate sealed envelope attached to the outside of the Bid Envelope. Bidders must be licensed for the highest amount of their bid. Each Bid shall be marked on the outside of the envelope, the date of the proposal, the name of the Bidder, and acknowledgment of any Addendums that were received. The right is reserved to reject any or all bids, to waive any informality in any bid, and to hold bids for a period not to exceed 30 days from the date of opening of bids. Roadway construction including excavation, aggregate base course, hot mix asphalt paving, and storm culvert installation. The project generally consists of the following approximate principal items: 998 CY of unclassified excavation, 1,738 tons of Class 5 aggregate base course (8-inch depth), 937 tons of hot mix asphalt (4-inch depth), 1,272 SY of topsoil removal, 11,447 SF of seeding for disturbed areas, and miscellaneous related work needed to complete the improvements. The work shall be substantially completed by October 10, 2026, and finally completed by October 24, 2026 If any person contemplating submitting a proposal is in doubt as to the true meaning of any part of the drawings, specifications, or other contract documents, or finds discrepancies in or omissions from the drawings of specifications, he may submit to the Engineer a written request for an interpretation or correction thereof.

Post-Bid

Playgrounds / Parks / Athletic Fields

$300,000.00

Public - City

Paving, Site Work

20

4

2

4

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
13
Active Projects
7
Bidding Soon
115
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 4, 2026

June 3, 2026

Project location map

5906 2nd Ave W, Williston, ND


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.