BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 7, 2026 at 8:00 PM

Updated May 16, 2026

Renovation of an educational facility in Muskegon, Michigan. Completed plans call for the renovation of a educational facility.

This is a Request for Proposal (RFP) from responsible parties to replace two existing walk-in cooler/freezers at Muskegon High School. The School District reserves the right to reject any or all proposals as it deems to be in the best interest of the School District. Award date by April 22nd. Deadline for clarification requests is April 10 TH , via email to: Matt Buchanan (matt@hri-inc.com) or Scott Boyd sboyd@mpsk12.net ITEM # 1 WALK-IN COMBO COOLER/FREEZER (Loading Dock Area) Quantity: One (1) Manufacturer: Thermo-Kool Model: Walk-In Cooler/Freezer 1. One (1) THERMO-KOOL Walk-in Cooler/Freezer 27' 8" x 24' 10" x 7' 6" High Insulation: 4" DURATHANE, all-urethane foamed-in-place (Class 1) Exterior: Stucco Aluminum Interior: Stucco Galvanized Interior Cooler Floor - Smooth aluminum with foamed in 3/4" Marine Plywood Interior Freezer Floor - Smooth aluminum with foamed in 3/4" Plywood Cooler, Freezer with Floor (2) 48" x 78" Flush Mounted Entrance Door(s), with hardware, Pilot light & switch assembly, vapor proof light & dial thermometer. NSF LISTED (2) Interior Ramp (2) Stainless Steel to Interior & Exterior of Door & Frame (2) Door(s) with (3) Hinges per door (2) 14" x 24" peep window w/ heated frame & glass (2) 36"H 1/8" Aluminum Treadplate kickplates and jamb guards int & ext (2) CCI Clear Vu vinyl swing door(s) (2) Pressure relief vent(s) (9) 48" LED light fixture(s) w/ bulbs (1) Bluezone 2400(2) Four-sided column cutout(s) Ceiling & floor Splice Vinyl coved base on exposed exterior 1/8" Treadplate wainscot on exp. exterior 36" high (shipped loose for field installation) (2) - 1 Year Labor Warranty on Refrigeration 1 1/2 HP, Remote Pre Assembled Refrig. System Model RFON180E4AEANT 208- 230/60/3 Medium Temperature, base, weather hood, winter controls, Scroll, Air-cooled, R454A (8.7 Compressor RLA) w/ leak detection with RAL6A141ADARSF 115/60/1 coil (1.6 amps) with Dual Speed EC motor and EcoNet 2.0 with Sporlan SER. Accessories: 1 ea A2L SSOV and CSOV Mitigation Valves (Shipped Loose For Field Install). 1 ea Suction Accumulator w/ Suction Line components.6 HP, Remote Pre Assembled Refrig. System Model RFON600L4AEANT 208-230/60/3 Low Temperature, base, weather hood, winter controls, Scroll, Air-cooled, R454A, No Defrost Provisions (19.6 Compressor RLA) w/ leak detection with 2 RAL6E110DDARSF 208-230/60/1 coil (1 fan amps, 9.8 heater amps) with Dual Speed EC motor and EcoNet 2.0 with Sporlan SER. Accessories: 2 ea A2L SSOV and CSOV Mitigation Valves (Shipped Loose For Field Install). 2 ea Suction Accumulator w/ Suction Line components.WALK-IN COMBO COOLER/FREEZER (Main Kitchen Area) Quantity: One (1) Manufacturer: Thermo-Kool Model: Walk-In Cooler/Freezer 1. One (1) THERMO-KOOL Walk-in Cooler/Freezer 15' 6" x 13' 7" x 8' 6" High Insulation: 4" DURATHANE, all-urethane foamed-in-place (Class 1) Exterior: Stucco Aluminum Interior: Stucco Galvanized Interior Cooler Floor - Smooth aluminum with foamed in 3/4" Marine Plywood Interior Freezer Floor - Smooth aluminum with foamed in 3/4" Plywood Cooler, Freezer with Floor (2) 36" x 78" Flush Mounted Entrance Door(s), with hardware, Pilot light & switch assembly, vapor proof light & dial thermometer. NSF LISTED (2) Interior Ramp (2) Stainless Steel to Interior & Exterior of Door & Frame (2) Door(s) with (3) Hinges per door (2) 14" x 24" peep window w/ heated frame & glass (2) 36"H 1/8" Aluminum Treadplate kickplates and jamb guards int & ext (2) CCI Clear Vu vinyl swing door(s) (2) Pressure relief vent(s) (2) 48" LED light fixture(s) w/ bulbs (1) Bluezone 2400 Vinyl coved base on exposed exterior 1/8" Treadplate wainscot on exp. exterior 36" high (shipped loose for field installation) (2) 1 Year Labor Warranty on Refrigeration1 1/4 HP, Remote Pre Assembled Refrig. System Model RFON150E4AEANT 208- 230/60/3 Medium Temperature, base, weather hood, winter controls, Scroll, Air-cooled, R454A (9.3 Compressor RLA) w/ leak detection with RAL6A113ADARSF 115/60/1 coil (1.6 amps) with Dual Speed EC motor and EcoNet 2.0 with Sporlan SER. Accessories: 1 ea A2L SSOV and CSOV Mitigation Valves (Shipped Loose For Field Install). 1 ea Suction line components: Sealed Filter. 3 1/2 HP, Remote Pre Assembled Refrig. System Model RFON350L4AEANT 208- 230/60/3 Low Temperature, base, weather hood, winter controls, Scroll, Air-cooled, R454A, No Defrost Provisions (10.9 Compressor RLA) w/ leak detection with RAL6E110DDARSF 208-230/60/1 coil (1 fan amps, 9.8 heater amps) with Dual Speed EC motor and EcoNet 2.0 with Sporlan SER. Accessories: 1 ea A2L SSOV and CSOV Mitigation Valves (Shipped Loose For Field Install). 1 ea Suction line components: Sealed Filter. (2) Compressor WarrantiesITEM # 3 INSTALLATION FOR (2) WALK-IN COMBO COOLER/FREEZERS Quantity: One (1) LOT Installer: SWANSON MECHANICAL Model: Installation 1. Swanson Mechanical is responsible to Demo and Dispose of Existing Walk In's in both loading dock and main kitchen spaces. They are to install two new combination cooler/freezer walk-ins and Start Up. Includes: Installation of Refrigeration System, Electrical Upgrades, Building Room around Indoor Condensing Units, including adding venting, and Crane. Exceptions: Delivery (Installer will meet Freight Truck at Site to receive new units), Sales Tax State of Michigan Plan Review Is IncludedINSTALL SCOPE BY DEALER Quantity: One (1) Manufacturer: FSEC (BIDDING DEALER/FOODSERVICE EQUIPMET CONTRACTOR) Model: INSTALL BIDDING DEALER TO PROVIDE THE FOLLOWING SCOPE OF WORK AS FOLLOWS: 1. Confirm all utilities prior to ordering with owner (electrical work to be handled by trades contracted through the local installer) to include: a. Overall size/footprint b. Electrical loads c. Plumbing connections if required. 2. Coordinate with installer to aid in delivery of the walk-in panels, refrigeration systems 3. Oversee the following when on site during installation: a. Receive, uncrate, deliver, and set in place ALL equipment items. b. Remove and dispose of all protective wrapping. a. Make refrigeration connections and ensure proper operation of all applicable equipment. c. Make final electrical connections for new walk-ins 5. Clean and sanitize all work surfaces and make ready for first use by owner 6. Provide operation manuals (electronically to owner) 7. Coordinate any factory start-ups as required 8. Coordinate factory-training upon installation completion 9. Provide warranty information for all equipment Not Included in the Scope of Work: - Startup/Field Demonstration of Equipment (done by local factory representation)

Award

Educational

$200,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
84
Active Projects
48
Bidding Soon
633
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 17, 2026

May 18, 2026

Project location map

80 W Southern Ave, Muskegon, MI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.