BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 27, 2026 at 8:00 PM

Updated May 21, 2026

Site work for a playground / park / athletic field in Travelers Rest, South Carolina. Completed plans call for site work for a playground / park / athletic field.

The City of Travelers Rest, South Carolina is soliciting sealed proposals from qualified contractors for the construction and installation of Dicey Langston Plaza, Charters of Freedom Plaza, and Swamp Rabbit Trail Entrance Improvements (near Spring Park Inn). The project includes site construction, hardscape, landscaping, and associated improvements as described herein. Dicey Langston Plaza Construction of Plaza Area Installation of walls, walks, steps, and ADA-compliant ramps Integration and connection of the Dicey Langston Statue Associated landscaping (trees, shrubs, groundcovers, boulders, and turf) Charters of Freedom Plaza Construction of plaza surface Installation of monument pedestals and foundation for Charters of Freedom documents Associated hardscape and landscaping Swamp Rabbit Trail Entrance Improvements Renovation of existing plaza to function as a formal trail entrance Demolition and reconstruction of existing walls for access walk Construction of connecting walks and (this may be redundant verbiage) Associated Landscaping (trees, shrubs, groundcovers, and turf) The selected contractor shall provide all labor, materials, equipment, and supervision necessary to complete: Site preparation and grading Demolition of existing entry plaza wall Concrete and masonry construction (walls, steps, plazas) ADA-compliant ramps and walkways Installation of monument pedestals and foundation Demolition of sections of asphalt drive to accommodate installation of new walk Landscaping (trees, shrubs, groundcovers, and turf) Irrigation for site stabilization and establishment of plant materials Coordination with statue installation and Charters of Freedom elements Erosion control and site stabilization Questions Due April 10, 2026 Project Consists of the Construction of a Statue and Pedestal, Including Associated Sidewalk and Display Appurtenances.

Award

Playgrounds / Parks / Athletic Fields

$308,258.00

Public - City

Site Work

16

3

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
214
Active Projects
120
Bidding Soon
1,402
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 18, 2026

May 4, 2026

Project location map

303 Old Buncombe Rd, Travelers Rest, SC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.