BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 19, 2026 at 8:00 PM

Updated May 20, 2026

Site work for a water / sewer project in Dover, New Hampshire. Completed plans call for site work for a water / sewer project.

Question Deadline 04/16/2026 Any questions or inquiries must be submitted in writing, and, in order to be considered, must be received by the Purchasing Agent (k.cragin@dover.nh.gov ) no later than seven (7) calendar days before the Request for Proposals due date and time. Any changes to the Request for Proposals will be provided to all Proposers of record. The City of Dover is seeking pricing to complete drainage improvements on Penny Lane. This project is intended to improve the drainage collection system along the cul-de-sac on Penny Lane. The project includes installation of two deep sump catch basins and 12in high density polyethylene (HDPE) drain lines to collect surface runoff and direct it into the city drainage system. Test pits have been completed by city personnel prior to design in order to determine the presence and depth of existing ledge. It is anticipated that some ledge will need to be removed to complete the drainage improvements. In addition, the work will include installation of a 6in HDPE drainage stub from proposed CB #1 to the property line of House #10 Penny Lane for future connection to a private sump drain line completed by others. Scope of Work: Contractor work to include with project quote for consideration: o Estimated ledge removal of 20CY o Field core existing CB #1710 for new 12in HDPE drainage pipe o Contractor to dispose of all excess excavation material o Contractor to restore the pavement surface to its original condition and dispose of existing pavement. o Contractor to follow City of Dover guidelines for drain line installation and gravels in trench, o All materials and installation procedures shall adhere to City of Dover Construction Standard Details. See Attachment D. List of Material the City will provide: o 2 - 4ft diameter catch basins o 12in HDPE drainage pipe o 6in HDPE drainage pipe and cap o Bedding and backfill materials The task shall begin June 2026 and be completed by end of August 2026.

Bid Results

Water / Sewer

$81,774.00

Public - City

Site Work

4

4

4

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 23, 2026

June 1, 2026

Project location map

Penny Ln, Dover, NH

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.