Published June 4, 2026 at 8:00 PM

Updated June 5, 2026

Site work and paving for a road / highway in Riverside, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Project has been Rebid The work consists of complete resurfacing of Bellegrave Avenue between Etiwanda Avenue and Bain Street with a 2-inch grind and overlay. The project also includes restriping the roadway to add a new bike lane and upgrading four curb ramps to current ADA standards. All work must be performed in accordance with the bid documents, standard plans, standard specifications, reference specifications, and other contract documents on file. Bidders must submit sealed proposals on the Citys forms, accompanied by a ten percent (10%) bid guarantee. The successful bidder must be properly licensed, provide required bonds and insurance, and perform at least 50% of the contract work with its own organization. All applicable prevailing wage requirements apply, including Davis-Bacon Act and State labor codes. Bidders and subcontractors must be registered with the Department of Industrial Relations. The project is funded through a federal Community Development Block Grant and is subject to additional compliance requirements, including electronic certified payroll reporting. The successful bidder and subcontractors must agree to adhere to the terms of the Community Workforce Agreement by executing a Letter of Assent. Bids must be physically submitted by the deadline; electronic bids will not be accepted. Question Deadline 05/26/2026 at 5:00 PM PT For information on the proposed project requirements, please submit any RFls through online. All questions and the proposal shall be submitted to Youssef Baskaron ybaskaron@jurupavalley.org Est.value- 1,100,000 The purpose of this Request for Proposals(RFP) isto select the most qualified Consultant to provide Construction Management, Construction Inspection Services for 2025-2026 CDBG Bellegrave Avenue Pavement Rehabilitation Project CIP#25103. The scope of work includes the grinding and overlay of Bellegrave Avenue from Etiwanda Avenue to Bain Street, installation of new roadway striping, and construction of four(4) ADA-compliant curb ramps. Project anticipated Construction duration is 60 working days. o Following are anticipated project tasks to be performed by the selected consultant. Consultants shall provide any additional information to demonstrate their understanding of the scope and experience in similar types of projects and services. Deliver construction management and inspection services in accordance with the Project plans, specifications, and estimates (PS&E). Manage and coordinate all aspects of the Project inclusive of services identified in the RFP. Conduct a pre-construction meeting and bi-weekly construction meetings with the contractor, City, and other involved parties. Prepare and distribute meeting agendas and minutes. Coordinate with City staff, contractor when applicable, agencies, and Project stakeholders. Prepare weekly statement of working days. Participate in fieldmeetings and document issues, findings, direction, changes, etc., and develop solutions. Provide supervision, scheduling, and problem resolution for the contractor. Maintain Engineer's and Inspector's Daily Reports, and recording work in progress, which may include the hours worked by men and equipment. Contract Time Monitoring shall include review working days, contract time requirements, and documentation of time extensions. Maintain a written record of project progress, which shall indicate factors which may affect the work, such as, weather conditions, utility delays, strikes or labor disputes, and material shortages. Based on these factors a record of working days will be maintained, including: o Weekly Statement of Working Days. o Where work is being paid for based on the cost of labor, equipment, and material. o When there is an anticipated change in character of work. o When there is a potentially significant overrun or underrun, or o When there is disputed work or a potential claim. o When the report is used to determine compliance with labor provisions of the contract, the following additional information may be included: o The names or identification numbers of the contractor's personnel o The respective classifications of the work being performed. o The number of hours worked on the date covered by the report.

GC Bidding

Roads / Highways

$1,100,000.00

Public - City

Paving, Site Work

15

15

3

Subscribe For Documents

57 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
558
Active Projects
248
Bidding Soon
4,147
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 11, 2026

August 11, 2026

Project location map

Bellegrave Ave, Riverside, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.