Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published June 3, 2026 at 8:00 PM
Updated June 4, 2026
Site work and new construction of a playground / park / athletic field in Charlemont, Massachusetts. Working plans call for the construction of a playground / park / athletic field; and for site work for a playground / park / athletic field.
**As of June 3rd, 2026, bids were rejected. No definite date for the rebid** The Town of Charlemont invites sealed bids from qualified contractors for the design, construction, and installation of a stand-alone handicap accessible restroom facility at the Charlemont Fairgrounds, Park Street, Charlemont, MA. The work includes all labor, materials, and equipment and must comply with Massachusetts General Laws Chapter 30B and all applicable federal, state, and local regulations. The contract will be awarded to the lowest responsive and responsible bidder. The Town reserves the right to reject any or all bids if deemed in its best interest. Additional bid documents and specifications are available on the Town of Charlemont website. Questions must be received by: April 20,2026 The project consists of furnishing all labor, materials, equipment, and supervision necessary for the design, construction, and installation of a stand-alone restroom building including: o Concrete slab foundation with raised footings approximately two (2) feet above grade o Two restroom units within one structure o Total of six (6) restroom areas: o Two (2) Women's restrooms o Two (2) Men's restrooms o Two (2) Gender-neutral restrooms o Four (3) stalls per side (minimum), with at least one fully ADA-compliant stall in each restroom o Plumbing, electrical, ventilation, lighting, and all related site work All work shall comply with applicable federal, state, and local regulations, including but not limited to: o Massachusetts State Building Code o Massachusetts Architectural Access Board (521 CMR) o Americans with Disabilities Act (ADA) o All applicable plumbing and electrical codes Design Requirements The facility shall include: o Accessible layout ensuring full ADA and 521 CMR compliance o Clear accessible pathways to the facility o Adequate lighting and ventilation o Separate electrical circuits for interior and exterior lighting o Durable, weather-resistant, and easy-to-clean materials o Proper ADA signage including Braille o Accessible-height sinks and hand dryers o Emergency call buttons in accessible stalls o Non-slip flooring o Proper site drainage o Low-point drain for winterization o Installation of ramps and handrails where required Construction Requirements o Use of high-quality, weather-resistant materials suitable for outdoor use o Water-efficient plumbing fixtures o Installation of all necessary plumbing and electrical systems o Compliance with all local, state, and federal codes o Sustainable practices encouraged Question Deadline 04/20/2026 All questions regarding this IFB must be submitted in writing to: Sarah Reynolds Town Administrator administrator@townofcharlemont.org
Final Planning
Playgrounds / Parks / Athletic Fields
$658,019.00
Public - City
New Construction, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
