BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 14, 2026 at 8:00 PM

Updated May 21, 2026

Renovation of a mixed-use development in Medina, Ohio. Completed plans call for the renovation of a educational facility; and educational facility.

Sealed bids are requested for roof replacement projects at Medina High School (Roof Sections P & Q) and A.I. Root Middle School (Roof Sections A, B, & C). Total construction estimates are $393,504.00 for Medina High School and $458,022.00 for A.I. Root Middle School. All technical questions regarding the Plans and Specifications should be addressed to: Taylor Consulting Group, LLC P.O. Box 1570 Mentor, OH 44061 Phone: (440) 840-9019 Contact: Greg Taylor email: gtaylor@tcgroupdesign.com GENERAL DESCRIPTION OF WORK SCOPE A. Without force and effect on requirements of the contract documents, the descriptive of the work of the Contract can be summarized as follows: 1. Project Drawings TS-1, RC-1, RC-2, RC-3, RC-4, RC-5, & RC-6 are for contractor reference only. Contractor shall visit the site, analyze, and measure specific work items and otherwise be knowledgeable of the roofing work required. 2. It is mandatory that the work be done in a manner that no weather element (rain, wind, dirt, snow, etc.) penetrates through the roof assembly into the enclosed building space. Special care is to be taken to limit the work of a day so that such weather protection occurs. A watertight tie on is required at the end of each workday. a. At the end of each workday or when precipitation is threatening the newly installed roof system. Utilize mastic as necessary to furnish a complete watertight night seal. It is mandatory that the watertight night seal is installed to the existing built-up roof systems. 3. All staging, scaffolding and erection necessary to complete specified Roof Replacement work. Contractor shall properly barricade staging work areas with temporary fencing and shall protect building materials from damage at all times. Dumpsters, bathroom facilities, and ground material storage shall be located within the construction staging area. B. BASE BID ITEM 2: ROOFING CONTRACT A.I. Root Middle School- Modified Bitumen Membrane Roofing 1. Roof Sections A, B, & C - Existing Roof System Make Up: i. Metal Decking ii. 1 - Layer of 3.0'' Polyisocyanurate Insulation (mechanically fastened) iii. 1/2 '' Sloped Tapered Polyisocyanurate insulation saddles iv. .060 Fully Adhered EPDM Roof System. 2. Roof Sections A, B, & C - New Roof System Make Up: i. Metal Decking ii. Existing insulation system iii. 1 Layer of 2.5'' Polyisocyanurate Insulation (Mechanically Fastened) iv. 1/2 '' Sloped Tapered Polyisocyanurate Insulation Saddles v. Manufacturers Coverboard (Insulation Adhesive) vi. 2-Ply Modified Bitumen Roof System (Torch Applied)

Post-Bid

Educational

$851,526.00

Public - City

Renovation

9

13

6

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
308
Active Projects
187
Bidding Soon
3,023
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.