Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 11, 2026 at 8:00 PM
Updated May 15, 2026
Site work and paving for a mixed-use development in Farmington Hills, Michigan. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
5.48 mi of concrete road rehabilitation, concrete patches, concrete cold milling and hot mix asphalt resurfacing, drainage improvements, concrete curb, gutter, sidewalk, ramps, permanent signing, and pavement markings on 12 Mile Road from Novi Road to Farmington Road, Oakland County. This project includes a 1 year hot mix asphalt warranty. This is a Local Agency project. 4% SBP Participation Required Net classification required for this project is 10773 Cb In addition to the above minimum prequalification requirement for prime contractors this project includes a subclassification of Ea. If the prime contractor is not prequalified in this subclassification it must use a prequalified subcontractor. This subcontractor must be designated prior to award of the contract to the confirmed low bidder. MI DOT - 2605 023 - Road Rehabilitation, Concrete Patches, Concrete Cold Milling and Hot Mix Asphalt Resurfacing
Bid Results
Roads / Highways
$12,247,644.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 1, 2026
June 30, 2026
12 Mile Rd, Farmington Hills, MI
Related To This Project
Farmington Hills, MI
Bid Date: May 08 2026
Farmington Hills, MI
Bid Date: May 01 2026
Farmington Hills, MI
Bid Date: Jun 01 2026
Farmington Hills, MI
Bid Date: May 13 2026
Farmington Hills, MI
Bid Date: May 28 2026
Farmington Hills, MI
Bid Date: Apr 29 2026
Farmington Hills, MI
Bid Date: May 28 2026
Farmington Hills, MI
Bid Date: Apr 02 2026
Farmington Hills, MI
--
Farmington Hills, MI
--
Farmington Hills, MI
Bid Date: Mar 10 2026
Farmington Hills, MI
Bid Date: Mar 10 2026
Farmington Hills, MI
Bid Date: Mar 31 2026
Farmington Hills, MI
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
