BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 22, 2026 at 8:00 PM

Updated May 20, 2026

Renovation of a recreation facility in Castleton, Vermont. Completed plans call for the renovation of a recreation facility.

Parks and Recreation Activity Center Gymnasium Floor Replacement. The project is for the replacement of the gymnasium floor at the Castleton Parks and Recreation Activity Center, located at 47 Mechanic Street, Castleton, Vermont. The company will provide the following services: 1. Site Preparation. a. Remove approximately 4,600 sq. ft. of existing tile and properly dispose of debris. b. Scrape and/or sand mastic off the slab and any other general surface preparation. c. A moisture mitigation system should be applied to the slab prior to floor installation. 2. New Floor Installation. a. Install a new approximately 4,600 sq. ft. long-lasting, seamless, synthetic, shock-absorbing gymnasium floor with game lines. Preference is given to floors that can eventually be resurfaced to extend its longevity. b. If baseboard is necessary, it should be included in the bid; if it is not needed, please specify. c. All aspects of installation not covered in this document (specifications) should meet current commercial industry standards. 3. Coordinating Instructions. a. Colors to be determined at time of bid approval. b. The contractor will provide all materials, equipment and labor for completion of the entire projec c. Upon completion, all trash and equipment from the project will be immediately removed from the facility and Town property; including dust, dirt, etc. in and adjacent to the gymnasium that originated from floor demolition. d. Coordination is required with the Town Manager and Parks & Recreation Program Coordinator and Facilitator on daily work to minimize disruption of daily operations. The Castleton Parks and Recreation Activity Center is open Monday thru Sunday. Activities normally conducted in the gymnasium will be suspended during the duration of this project. e. Coordination is required with the Town Manager and Parks & Recreation Program Coordinator and Facilitator on daily work to minimize disruption of daily operations. The Castleton Parks and Recreation Activity Center is open Monday thru Sunday. Written questions should be mailed or emailed to Town of Castleton to the attention of "Town Manager" at the following address: Town of Castleton ATTN: Town Manager RFP: 2026-03-23-02 Gym Floor 263 Route 30N Bomoseen, VT 05732 Phone: (802) 468-5319 ext. 203 Email: manager@castletonvt.org Email: administration@castletonvt.org

Post-Bid

Amusement and Recreation

$100,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
282
Active Projects
163
Bidding Soon
1,708
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 22, 2026

May 22, 2026

Project location map

47 Mechanic St, Castleton, VT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.