BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 14, 2026 at 8:00 PM

Updated May 14, 2026

Site work and paving for a road / highway in Summerhill, Pennsylvania. Completed plans call for site work for a road / highway.

The work consists of the variable depth milling of bituminous asphalt pavement, crack cleaning and sealing, and bituminous asphalt overlays along a 1.8 mile section of Tunnel Street designated as part of the 911 National Memorial Trail. The work includes all materials, equipment, supplies, and labor for the construction as shown and specified. Instructions to bidders: Bids must be submitted for all work as shown and specified. Bidders must obtain bidding documents from the designated issuing office to be eligible. Printed copies and electronic versions of the bidding documents are available for a fee. Successful bidders must furnish a satisfactory Performance Bond and Labor & Material Payment Bond each equal to 100% of the total contract amount, as well as evidence of required insurance coverage. All bidders must comply with State anti-bid-rigging regulations and submit a non-collusion affidavit. Compliance with the "Steel Procurement Act" and PA Prevailing Wage Rates is required. The Owner reserves the right to reject any or all bids and to waive minor informalities.

Bid Results

Roads / Highways

$258,376.00

Public - City

Paving, Site Work

9

17

3

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 4, 2026

June 3, 2026

Project location map

Tunnel St, Summerhill, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.