BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 16, 2026 at 8:00 PM

Updated May 20, 2026

Site work and paving for a mixed-use development in Baraboo, Wisconsin. Completed plans call for site work for a playground / park / athletic field; sidewalk / parking lot; sidewalk / parking lot; and road / highway.

In general, the work consists of resurfacing and reconstructing existing parking lots and roadways throughout the park to repair deteriorating surface conditions and failing pavement and to reduce yearly maintenance costs. The work includes pulverizing existing pavement, excavation to subgrade, new base material and pavement, geotextile fabric, concrete curb and gutter, concrete storm sewer pipe and storm structures, adjustment in surface grades for better drainage, extension of parking lot LED lighting to increase visibility, addition of concrete dumpster pads, and surface restoration including pavement markings and signs. Modifications to existing medians and/or islands configurations will add parking stalls. Improvements to rescue roadways will include removal of vegetation/shrubs/trees, addition of dense graded base, grading roadway for positive drainage, grading/removal of road side berming/accumulated materials, ditch cleaning and grading to provide improved drainage, ditch stabilization, culvert replacement and new culverts, and culvert markers. A new ADA accessible kayak launch will be installed to comply with ADA accessibility requirements and a new parking lot will also be built in preparation of a future ADA accessible trailhead. The overall work includes general erosion control and turf restoration. All potential bidders must be certified by DOA prior to submitting bids on state construction projects over $100,000. Bids received from contractors who are not certified will be rejected. Bid documents may be obtained electronically as PDFs from the Division's Projects Bidding website. Base bid will be received as a single lump sum bid for all work. Bid guarantee in the amount of 10% of the bid must accompany each bid submitted. Contract offer and construction phase records will be processed electronically via eBuilder. Sealed bids may be submitted via the eBuilder Bidding Portal (preferred), U.S. Mail or third-party delivery, or hand delivery to the designated drop box. The bidder is responsible for ensuring timely delivery of the sealed bid. Bid opening will be conducted via Microsoft Teams. A non-mandatory pre-bid tour is scheduled, and attendance is encouraged. Additional instructions and details for obtaining plans, submitting bids, and contacting project representatives are provided in the full bid documentation.

Bid Results

Sidewalks / Parking Lot

$320,000.00

Public - State/Provincial

Paving, Site Work

67

28

9

5

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 13, 2026

August 3, 2026

Project location map

Multiple Locations, Baraboo, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.