BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 5, 2026 at 8:00 PM

Updated May 16, 2026

Site work for a water / sewer project in North Chicago, Illinois. Completed plans call for site work for a water / sewer project.

The project includes the construction of storm sewer removal and replacement at the locations shown on the plans. The work also includes excavation and disposal, trench backfill and compaction, water main adjustments, HMA pavement removal and replacement, PCC curb and gutter and sidewalk removal and replacement, and parkway restoration. The proposed improvements also include structure adjustments, pavement markings, and all other appurtenant work and materials necessary to complete the project in accordance with the Plans, Standard Specifications, and Special Provisions. Bidders are required to submit a completed Business Enterprise Program (BEP) Goal DCEO BEP Utilization Plan with their bid. The cumulative BEP for this project is thirty percent for BEP firm designations: MBE/WMBE/WBE. Each bid shall be accompanied by a bid bond, bank draft, cashier's check or certified check payable to the order of the City of North Chicago in an amount not less than ten percent of the amount of the bid, as a guaranty that the bidder will execute the contract, if it is awarded, in conformity with the bid form. The successful bidder will be required to furnish a Performance and Payment Bond on forms provided in the Specifications and Contract Documents, in an amount equal to 100 percent of the contract sum. The contractor shall pay prevailing wages in accordance with the Prevailing Wage Act as defined by the Illinois Department of Labor Prevailing Wages for Lake County. The City of North Chicago reserves the right to reject any or all bids and to waive any informalities or technical irregularities in a bid. Final award of the bid shall be contingent on DCEO approval of the Contractor's BEP plan that meets thirty percent MBE/WMBE/WBE utilization. Location - City of North Chicago - 20th Street and Broadway Avenue

Bid Results

Water / Sewer

$3,025,716.00

Public - City

Site Work

50

6

5

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
619
Active Projects
292
Bidding Soon
3,662
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 1, 2026

June 30, 2026

Project location map

Multiple Locations, North Chicago, IL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.