Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 22, 2026 at 8:00 PM

Updated October 25, 2026

Site work for an educational facility in Midwest City, Oklahoma. Completed plans call for site work for a educational facility.

The addition of two multi-purpose athletic fields (with an alternate for a third field) to the existing complex with associated athletic equipment, spectator seating, dugouts, fencing, a restroom and concessions structure, shade structures, parking expansion and other site amenities. Subcontract bids over $50,000 are required to include the cost of Performance, Payment and Defect Bonds equal to one hundred percent (100%) of their bid amount. Subcontractors will be required to provide bid security in the form of a Bid Bond or other statutory permissible method in the amount of five (5%) percent of the bid amount if the bid is in excess of fifty thousand ($50,000) dollars. The Owner expressly reserves the right to waive any formalities and to reject any or all bids. The addition of two multi-purpose athletic fields (with an alternate for a third field) to the existing complex with associated athletic equipment, spectator seating, dugouts, fencing, a restroom and concessions structure, shade structures, parking expansion and other site amenities. Bid Result - Trade – Site Utilities - D. Owen Const - $820,000.00 Trade – Landscaping and Irrigation - Pitzer's Lawn Mgmt - $236,620.73 Trade – Fencing - Apex Fence - $184,600.00 Trade – Synthetic Turf Fields - United Turf & Track - $1,574,000.00 Trade – Asphalt & Concrete Paving - Turningpoint - $940,700.00 Trade – Gabion Retaining Walls - D. Owen Const - $390,000.00 Trade - Earthwork - Pintail Construction - $822,311.20 Trade - Electrical - KB Electric - $1,190,000.00 Trade - Pre-Engineered Shade Structures - Happy Playgrounds - $196,417.00 Trade - Scoreboards - Specialty Sales Assoc. - $36,332.00 Trade - Wall Padding - Specialty Sales Assoc. - $20,772.00 Trade - Foul Ball Poles - Specialty Sales Assoc. - $18,492.00 Trade - Backstop Netting System - Containment Systems - $101,250.00 Trade - Prefabricated Concrete Concessoin & Restroom Building - Lippert Bros., Inc. - $812,000.00 Trade - Metal Railings - Johnson Welding - $125,000.00 Trade - Cast-in-Place Concrete - 4G Concrete - $337,800.00

Bid Results

Educational

$7,806,295.00

Public - City

Site Work

120

20

17

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
178
Active Projects
56
Bidding Soon
1,006
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 29, 2026

June 29, 2026

Project location map

9400 SE 29th St, Midwest City, OK

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed